ElectroHuila inaugurates its first solar farm with own resources

The Electrificadora del Huila inaugurated the Granja Solar El Bote, built in 79 days with a $3.5 billion investment from its own resources, becoming the first photovoltaic plant by a public energy company in Colombia. Mines and Energy Minister Edwin Palma Egea attended the event and praised manager Nika Cuéllar's leadership. This project positions Huila as a leader in clean energies.

The Granja Solar El Bote, located next to the El Bote substation on the road to Palermo, began operations with 990 kW of installed capacity, consisting of 1,620 high-efficiency solar panels. This distributed generation project, classified under CREG 174 of 2021, was designed and built by a team of 17 ElectroHuila workers, without outsourcing, adhering to CREG, CNO, and RETIE standards.

Minister Edwin Palma Egea, at the inauguration, urged other public distributors to enter energy generation to reduce dependencies and lower rates. "Congratulations to the Electrificadora del Huila and those who made this project possible. The country's challenge is to continue growing in clean, non-fossil energy generation, thus lowering energy rates in Colombia and ending monopolies," he stated.

For manager Nika Cuéllar, this initiative fulfills a commitment to the national energy transition. "It is clean energy produced right here, with our talent and own resources. It is a demonstration of what public electrificadoras can build for Colombia," she said. The plant will generate 1.9 GWh per year, avoiding 800 tons of CO₂, equivalent to preserving over 38,000 trees annually.

This achievement aligns with the national energy transition policy and the National Development Plan, highlighting ElectroHuila's execution capacity among the country's seven state electrificadoras.

Related Articles

Dramatic illustration of power lines blocked at Colombia-Ecuador border due to export suspension over tariffs.
Image generated by AI

Colombia suspends electricity exports to Ecuador over tariffs

Reported by AI Image generated by AI

Colombia's Ministry of Mines and Energy published Resolution 40064 on January 22, 2026, suspending international electricity transactions with Ecuador in response to President Daniel Noboa's 30% tariffs. The measure takes effect from 6 PM that day and prioritizes national supply. Ecuador claims it has sufficient capacity to meet its energy demand without imports.

Emcali has received the environmental license from the Valle del Cauca Regional Autonomous Corporation to build the Mulaló Solar Park, the largest photovoltaic project in southwestern Colombia. This approval marks a key step in the region's energy transition, with a 69.9 MWp capacity that will benefit around 50,000 households.

Reported by AI

Organización Terpel has signed a contract to acquire 100% of the shares in Pétalo del Norte de Santander I, a 26.4 MWp solar photovoltaic plant. The deal involves Generadora 205 S.L. and Erco Energía S.A.S. as sellers, aiming to advance Colombia's energy transition.

Transportadora de Gas Internacional (TGI) and Hocol have signed an agreement to connect the Ballena regasification unit with the offshore Chuchupa field. This development will enable the injection of up to 250 million cubic feet of gas daily into the national system starting January 2027. The deal aims to secure Colombia's natural gas supply and support an orderly energy transition.

Reported by AI

Empresas Públicas de Medellín (EPM) unveiled a plan to modernize energy substations in Antioquia, investing over $1.1 trillion until 2030. The initiative aims to cut interruptions and adapt to future needs like renewables and electric mobility. Esteban Duque Franco, EPM's Transmission and Distribution Manager, emphasized its role in boosting economic and social development in the region.

The Mining-Energy Planning Unit (Upme) has launched a public call for the design and construction of the Nueva Lorica Substation, including its associated transmission lines. The project aims to bolster energy services in the departments of Sucre and Córdoba, addressing the rising electricity demand in the municipalities of Lorica, Chinú, and Coveñas.

Reported by AI

Energy Secretary Luz Elena González joined President Claudia Sheinbaum in Sonora to unveil investments in energy infrastructure, featuring the expansion of a pipeline to Guaymas. The project encompasses a liquefaction plant to export gas to Asia and enhance supply to southern Mexico. With a 131 billion peso investment, it establishes Mexico as a key energy hub in Latin America.

 

 

 

This website uses cookies

We use cookies for analytics to improve our site. Read our privacy policy for more information.
Decline