Johannesburg to face water maintenance shutdown on Friday

Johannesburg residents are preparing for a 12-hour water maintenance shutdown scheduled for Friday, 17 July 2026. The work by Rand Water and Eskom will reduce pumping across multiple systems. Officials say the impact should be less severe than previous maintenance.

Joburg Executive Mayor Dada Morero announced the second phase of maintenance will run from 7am to 7pm. Systems including Sandton, Midrand, Soweto, Randburg and Roodepoort will see reduced inflows. Pumping at the Palmiet system will drop to 78 percent of normal, while Eikenhof and Zwartkopjes systems will operate at 50 percent.

More than 340 areas across the city are expected to experience low pressure or no water. Johannesburg Water spokesperson Nombuso Shabalala said the shorter duration and improved planning should support quicker recovery than the May maintenance, which left parts of the Commando system without water for over 14 days.

Reservoir levels are being maximised ahead of the shutdown. Water tankers will be deployed if needed, with hospitals and clinics prioritised. Regular updates will be issued through official channels during the maintenance and recovery period.

Related Articles

Rand Water has begun phase one of a maintenance programme expected to run until 2 June, with experts saying the work will support long-term water supply reliability.

Reported by AI

Joburg Water has deployed roving and stationary tankers across affected areas in greater Johannesburg as Rand Water carries out infrastructure maintenance that began on Friday.

More than 1,200 outages have hit Johannesburg since 1 July, with residents reporting extortion schemes as City Power struggles to respond.

Reported by AI

Aguas Andinas announced a scheduled water outage affecting sectors of eight communes in the Santiago metropolitan region from Friday, May 22 to Sunday, May 24.

This website uses cookies

We use cookies for analytics to improve our site. Read our privacy policy for more information.
Decline