NASA cancels Exploration Upper Stage in Artemis program shakeup

NASA has canceled the Exploration Upper Stage for its Space Launch System rocket as part of a major revision to the Artemis program. The decision, announced by Administrator Jared Isaacman, aims to accelerate lunar landings by focusing on surface activities and using more efficient upper stages. This move supports testing of human landers from SpaceX and Blue Origin ahead of missions in 2027 and 2028.

NASA's Artemis program underwent a significant restructuring in early 2026, with Administrator Jared Isaacman prioritizing faster progress toward lunar surface missions. On March 6, 2026, a government procurement notice indicated that NASA plans to issue a sole source contract to United Launch Alliance for next-generation upper stages, specifically the Centaur V, for Artemis IV and V missions. This effectively ends development of the Exploration Upper Stage, contracted to Boeing over a decade ago for more than $3.5 billion since 2016, including an initial $962 million award.

The Exploration Upper Stage was intended to enable the Space Launch System to launch the Orion spacecraft alongside large payloads to the Moon. However, advancements by SpaceX, Blue Origin, and United Launch Alliance rendered it obsolete. Initial plans called for its use on the second SLS flight in 2021, but it remained years from readiness. The associated launch tower at Kennedy Space Center, originally estimated at $383 million, exceeded $2 billion in costs.

Isaacman's changes, unveiled last week before March 6, 2026, include canceling the Lunar Gateway space station and standardizing the SLS upper stage. Artemis III is set for launch next year, with one or two lunar landings targeted for 2028. To facilitate this, NASA met with SpaceX and Blue Origin engineers on January 13, 2026, where Isaacman stated, “We will challenge every requirement, clear every obstacle, delete every blocker and empower the team to deliver… and we will do it with time to spare.”

Docking requirements have shifted from the near-rectilinear halo orbit to options like the Elliptical Polar Orbit with Coplanar Line of Apsides (EPO/CoLA), which approaches within 100 km of the Moon's surface. SpaceX plans to prioritize its Starship human landing system, potentially docking in Earth orbit, while Blue Origin is refining a plan using three New Glenn launches without orbital refueling for its Blue Moon MK2. The US Senate has indicated broad support for these adjustments.

ተያያዥ ጽሁፎች

NASA Administrator Jared Isaacman announces delay of first human moon landing to Artemis IV in 2028 during press conference.
በ AI የተሰራ ምስል

NASA delays moon landing to Artemis IV in 2028

በAI የተዘገበ በ AI የተሰራ ምስል

NASA has overhauled its Artemis program, postponing the first human moon landing until the Artemis IV mission in early 2028. The changes, announced by Administrator Jared Isaacman on February 27, 2026, aim to increase launch frequency and reduce risks after repeated delays with the Space Launch System rocket. An additional test flight, now Artemis III, will focus on low-Earth orbit rendezvous with commercial lunar landers.

NASA has announced major changes to its Artemis program, shifting away from a lunar landing for the next mission in favor of incremental testing steps. The adjustments aim to increase launch frequency and reduce risks following recent setbacks. Officials hope this will lead to moon landings by 2028.

በAI የተዘገበ

NASA's Artemis II mission has advanced as its Space Launch System rocket and Orion spacecraft arrived at Launch Pad 39B at Kennedy Space Center. The overnight rollout marks a crucial step toward the first crewed Artemis flight, set to orbit the Moon. Engineers now prepare for prelaunch tests ahead of sending four astronauts on a 10-day journey.

The four astronauts preparing for NASA's Artemis II mission are in a two-week quarantine to avoid introducing harmful microbes to space. Medical experts monitor them closely as they stay indoors and avoid physical contact with others. This precaution aims to prevent any illness from delaying the first crewed trip to the moon's vicinity in over 50 years.

በAI የተዘገበ

The era of commercial space stations is set to begin in 2026, as private companies prepare to launch their own orbital outposts following the planned retirement of the International Space Station. These ventures aim to fill the gap left by the ISS and foster a new economy in low Earth orbit. Experts anticipate innovation and cost reductions driven by competition among providers.

Nasa has moved up the launch of its Crew-12 mission to the International Space Station to February 11, following the early return of the previous crew due to a medical issue. The astronauts will join the three remaining occupants aboard the orbiting laboratory. The mission originates from Cape Canaveral in Florida.

በAI የተዘገበ

Ten years ago, on December 21, 2015, SpaceX achieved a milestone by successfully landing the first stage of its Falcon 9 rocket after an orbital launch, marking a turning point in reusable rocketry. The event followed the company's recovery from a devastating failure earlier that year. This anniversary highlights the dramatic comeback detailed in Eric Berger's book 'Reentry'.

 

 

 

ይህ ድረ-ገጽ ኩኪዎችን ይጠቀማል

የእኛን ጣቢያ ለማሻሻል ለትንታኔ ኩኪዎችን እንጠቀማለን። የእኛን የሚስጥር ፖሊሲ አንብቡ የሚስጥር ፖሊሲ ለተጨማሪ መረጃ።
ውድቅ አድርግ