Kashiwazaki-Kariwa No. 6 reactor restarts after scheduled halt

The No. 6 reactor at the Kashiwazaki-Kariwa nuclear power plant in Niigata Prefecture restarted on Tuesday after a scheduled brief halt for inspections. Tokyo Electric Power Company Holdings reactivated it at 6:25 a.m., finding no issues in turbine-related equipment. This marks the first electricity generation in about 14 years for the unit.

Tokyo Electric Power Company Holdings (Tepco) brought the No. 6 reactor at the Kashiwazaki-Kariwa nuclear power plant back online on Tuesday at 6:25 a.m., following a suspension that began on Friday. The halt was part of procedures for a full-scale restart after an extended offline period, involving inspections that checked for abnormalities in turbine-related equipment. No issues were found, and the turbine began generating and sending electricity for the first time in about 14 years.

The reactor had initially restarted on the night of Jan. 21 after being suspended since March 2012. It was halted shortly afterward due to an issue with a device for moving control rods. Tepco later identified the problem as incorrect alarm settings, rectified it, and reactivated the unit on Feb. 9.

Tepco plans to ramp up the reactor's output to 100% and begin transmission to the Tokyo metropolitan area as early as this month. A final check is scheduled for March 18, after which commercial operations will start pending regulatory approval.

This restart occurs under stringent safety standards post-Fukushima, with Tepco emphasizing no anomalies detected during inspections.

Artikel Terkait

Niigata Governor Hideyo Hanazumi announces restart of Kashiwazaki-Kariwa nuclear plant at press conference, with facility image projected behind.
Gambar dihasilkan oleh AI

Niigata approves restart of world's largest nuclear plant

Dilaporkan oleh AI Gambar dihasilkan oleh AI

Niigata Governor Hideyo Hanazumi approved the restart of the world's largest nuclear plant, the Kashiwazaki-Kariwa facility, on Friday. This marks the first restart for operator TEPCO since the 2011 Fukushima disaster. The move supports Japan's goals to reduce fossil fuel reliance and achieve carbon neutrality.

Tokyo Electric Power Company Holdings (Tepco) began sending electricity from its Kashiwazaki-Kariwa nuclear plant in Niigata Prefecture to the Tokyo metropolitan area for the first time in about 14 years on Monday. The No. 6 reactor, restarted earlier this year, started generating and transmitting power at 10 p.m. Further inspections are planned ahead of potential commercial operations.

Dilaporkan oleh AI

Tokyo Electric Power Company restarted its No. 6 reactor at the Kashiwazaki-Kariwa nuclear power plant in Niigata Prefecture on Wednesday evening. This marks TEPCO's first reactor restart since the 2011 Fukushima accident, though local residents remain divided. Commercial operations are slated for February 26.

Japan's Environment Ministry plans to launch full-scale efforts to recycle soil collected during decontamination work at the Fukushima No. 1 nuclear power plant after the 2011 meltdown. The ministry seeks to reuse soil with low levels of radioactive contamination from areas polluted by the accident at Tokyo Electric Power Company Holdings' facility. It began using the soil in the front garden of the Prime Minister's Office and flower beds at central government offices in Tokyo's Kasumigaseki district last year.

Dilaporkan oleh AI

A power outage struck multiple JR East lines in Tokyo on Friday morning, January 16, suspending services on the Yamanote and Keihin-Tohoku lines. JR East anticipates resumption around 1 p.m. A fire at Tamachi Station may be linked to the incident.

A magnitude 6.9 earthquake struck off Iwate Prefecture on Sunday evening, prompting a tsunami advisory that was lifted shortly after 8 p.m. Waves reached up to 20 centimeters, with no reports of injuries or damage. The Tohoku Shinkansen was briefly suspended.

Dilaporkan oleh AI

Pemadaman listrik mengganggu sistem pendingin di Pembangkit Listrik Nuklir Chernobyl Ukraina, menimbulkan kekhawatiran tentang risiko radiasi potensial. Namun, para ahli menilai bahaya pelelehan sangat rendah karena kondisi bahan bakar tersimpan yang sudah tua. Badan Energi Atom Internasional sedang memantau situasi dengan cermat.

 

 

 

Situs web ini menggunakan cookie

Kami menggunakan cookie untuk analisis guna meningkatkan situs kami. Baca kebijakan privasi kami untuk informasi lebih lanjut.
Tolak