Russia pushes Amur reusable rocket tests to 2028

Russian space officials have outlined a new timeline for developing a reusable rocket designed to compete with SpaceX's Falcon 9. The updates come from a recent interview with a senior Roscosmos executive. The program now focuses on early testing rather than an immediate orbital debut.

Dmitry Baranov, Roscosmos’ Deputy Director General for Rocket Programs, told the RBC business publication this week that work centers on a first-stage demonstrator vehicle. Two tests are set to begin in 2028. The first will reach under 1 km altitude with the engine running throughout, while the second will climb to 10 km before restarting the engine for a landing on deployable legs.

The Amur-LNG rocket was announced in 2020 with an original target debut in 2026. Plans call for a reusable first stage powered by methane engines and capable of carrying 10.5 metric tons to low-Earth orbit. The RD-0169A engine remains in preliminary test firings.

Officials aim for the vehicle to replace the Soyuz 2 rocket, which currently handles Russian crew and cargo missions to the International Space Station. A May 2026 display indicated flight tests could start in 2031.

Articoli correlati

South Korea's Mir rocket postponed on launch pad due to safety concerns
Immagine generata dall'IA

South Korea postpones solid-fuel space rocket launch over safety concerns

Riportato dall'IA Immagine generata dall'IA

South Korea postponed the planned launch of its Mir solid-fuel space rocket on Tuesday due to safety issues detected during final preparations, the defense ministry said.

Japan's space agency conducted a successful test of a reusable rocket prototype on Saturday in Akita Prefecture.

Riportato dall'IA

NASA is preparing an orbital rehearsal during the Artemis III mission in 2027 to test prototype lunar landers from SpaceX and Blue Origin. The demonstration will allow crews and ground teams to practice complex rendezvous and docking maneuvers ahead of crewed landings planned for 2028.

NASA unveiled the four astronauts selected for its Artemis III mission on Tuesday at Johnson Space Center in Houston. The crew will test docking procedures with lunar landers in low Earth orbit ahead of a planned launch no earlier than summer 2027.

Riportato dall'IA

A spacecraft equipped with robotic arms launched this week to begin a mission servicing satellites in geosynchronous orbit. The Mission Robotic Vehicle, built by Northrop Grumman, lifted off aboard a SpaceX Falcon 9 rocket.

Questo sito web utilizza i cookie

Utilizziamo i cookie per l'analisi per migliorare il nostro sito. Leggi la nostra politica sulla privacy per ulteriori informazioni.
Rifiuta