KRL Rangkasbitung line train resumes after floods, workers check tracks for safety.
በ AI የተሰራ ምስል

KRL Rangkasbitung line resumes after flooding subsides

በAI የተዘገበ በ AI የተሰራ ምስል

KAI Commuter confirmed that Rangkasbitung line KRL services resumed on Monday evening after flooding on the Kebayoran-Pondok Ranji track subsided. Operations proceed at limited speed for safety. Prior disruptions included overhead power outage from lightning strike.

ይህ ድረ-ገጽ ኩኪዎችን ይጠቀማል

የእኛን ጣቢያ ለማሻሻል ለትንታኔ ኩኪዎችን እንጠቀማለን። የእኛን የሚስጥር ፖሊሲ አንብቡ የሚስጥር ፖሊሲ ለተጨማሪ መረጃ።
ውድቅ አድርግ