Meta announces major nuclear power agreements for AI infrastructure

Meta has secured agreements with three companies to obtain 6.6 gigawatts of nuclear power by 2035, supporting its AI projects including a new data center in Ohio. The deals involve Vistra, TerraPower, and Oklo, highlighting the tech giant's push into nuclear energy. This move underscores growing reliance on nuclear for powering AI ambitions.

Meta Platforms has revealed three significant nuclear energy agreements aimed at fueling its expanding AI infrastructure, particularly the Prometheus supercluster—a 1-gigawatt data center under construction in Ohio.

The partnerships, announced on January 9, 2026, are expected to deliver a total of 6.6 gigawatts of power by 2035. With TerraPower, Meta will fund the development of two new Natrium reactors, which use sodium as a coolant instead of water, capable of producing up to 690 megawatts as early as 2032. The agreement also grants Meta rights to energy from six additional reactors, adding 2.1 gigawatts by 2035.

In a separate deal with Oklo, Meta anticipates 1.2 gigawatts coming online by 2030 through multiple reactors. This collaboration is poised to create thousands of construction and operations jobs in Ohio. Notably, OpenAI CEO Sam Altman holds just over 4 percent of Oklo and is one of its largest investors. Meta will also finance Oklo's purchase of uranium for its reactors, signaling strong confidence in the startup's technology.

The third agreement with Vistra emphasizes extending the life of existing plants. Through 20-year contracts, Meta will purchase more than 2.1 gigawatts from Vistra's Ohio facilities, while supporting added capacity totaling 433 megawatts at those sites and another in Pennsylvania, expected in the early 2030s.

This initiative builds on Meta's previous 20-year deal with Constellation Energy and reflects a broader trend among big tech firms. For instance, Microsoft is reopening the Three Mile Island plant as its sole customer under a similar long-term arrangement. These moves address the surging energy demands of AI, though challenges persist in commercializing new reactor designs.

Related Articles

President Trump shakes hands with tech CEOs signing the Ratepayer Protection Pledge at the White House, with AI data centers symbolized in the background.
Image generated by AI

Tech giants sign White House pledge to cover AI data center power costs amid backlash

Reported by AI Image generated by AI

On March 4, 2026, leading tech firms including Amazon, Google, Meta, Microsoft, OpenAI, Oracle, and xAI signed the non-binding Ratepayer Protection Pledge at the White House, committing to fund new power generation and infrastructure for AI data centers to shield consumers from rising electricity bills. President Trump hailed it as a 'historic win,' but critics question its enforceability amid growing environmental and economic concerns.

Meta has announced a multi-year partnership with AMD to purchase up to six gigawatts of custom AI chips, potentially gaining a 10% stake in the chipmaker through performance-based shares. The deal, valued in double-digit billions per gigawatt, aims to support Meta's expanding AI infrastructure across its platforms. This arrangement mirrors a similar agreement AMD made with OpenAI last year.

Reported by AI

Meta has announced a collaboration with Nvidia to develop a hyperscale AI infrastructure designed to support billions of users globally. The initiative integrates Meta's production workloads with Nvidia's hardware and software ecosystem. The partnership aims to enhance AI capabilities at an unprecedented scale.

Meta has agreed to a three-year AI licensing deal with News Corp, paying up to $50 million annually for content from The Wall Street Journal and other brands. The arrangement allows Meta to use the material in its AI chatbot responses and for training models. News Corp confirmed the deal, highlighting its strategy of partnering with AI firms or pursuing legal action against unauthorized use.

Reported by AI

Elon Musk met with SpaceX's Brent at midnight to oversee xAI's new Colossus 2 supercomputer, set to become the world's largest and most powerful data center. The facility is incorporating over $375 million worth of Tesla Megapacks for sustainable energy to support advanced AI workloads.

Elon Musk's SpaceX has acquired his artificial intelligence company xAI, aiming to build data centers in space powered by solar energy. The merger combines AI, rockets, and satellite technology to advance space-based computing. Musk envisions this as a step toward lower-cost AI generation off Earth within a few years.

Reported by AI

Tech leaders like Elon Musk and Jeff Bezos propose launching data centres into orbit to power AI's massive computing needs, but experts highlight formidable hurdles. From vast solar panels and cooling issues to radiation risks, building such facilities in space remains far off. Projects like Google's 2027 prototypes show early interest, yet production-scale viability is distant.

 

 

 

This website uses cookies

We use cookies for analytics to improve our site. Read our privacy policy for more information.
Decline