Addis Ababa city administration mayor Adanech Abiebie inspected third-round corridor development works. The 13.4-kilometer projects across five routes proceed with quality and speed.
The mayor inspected routes from Bole Medhanialem to Golagol, Golagol to England, Bole Secondary School to Bole Junction, Imperial to Shala Park, and areas around Atlas. These segments total 13.4 kilometers. The developments feature wide pedestrian paths, bicycle lanes, and public service facilities. Construction around Adey Abeba Stadium continues at pace with emphasis on quality. The projects aim for full completion by the end of June to open for public use. Previously misused land has been reclaimed for communal service.