CFE Emergency Response Group monitors winter storm Fern's extreme cold, snow, and rain threatening power supply in Mexico from a control room.
Gambar dihasilkan oleh AI

Cfe activates emergency group for winter storm fern

Gambar dihasilkan oleh AI

The Federal Electricity Commission (CFE) installed its Emergency Response Steering Group in permanent session to monitor the third winter storm 'Fern', which will affect northern and central Mexico from January 23 to 25, 2026, with extreme cold, snowfalls, and rains. The action aims to ensure electricity supply amid potential disruptions in natural gas imports from the United States. As of noon on January 23, no impacts have been reported.

The third winter storm of the season, known as 'Fern', will interact with Cold Front 31 and an arctic air mass, creating adverse weather conditions in Mexico from Friday, January 23, to Sunday, January 25, 2026. According to the National Meteorological Service (SMN), minimum temperatures of -20 to -15 degrees Celsius are expected in the mountainous areas of Chihuahua, snowfalls in the sierras of Baja California, Sonora, Chihuahua, Sinaloa, and Durango, and intense rains in Durango and Veracruz. Wind gusts up to 100 km/h will affect Chihuahua, Coahuila, Durango, and Zacatecas, with possible whirlwind formation in Coahuila. On Sunday, an intense 'Norte' will raise waves to 4 meters in Tamaulipas and Veracruz, and snow could descend to peaks like Nevado de Colima, Cofre de Perote, and Pico de Orizaba.

Faced with this phenomenon, which will first hit Texas, Oklahoma, and Mississippi in the United States—where natural gas futures have already risen up to 75%—the CFE, led by Emilia Calleja, activated the Emergency Response Steering Group. This group, in permanent session, monitors meteorological developments and coordinates operations to prevent disruptions in electricity supply, as over 60% of energy is generated with natural gas, 70% of which is imported from the U.S., mainly from Texas.

The CFE has 28,000 MW of available capacity without natural gas, using conventional thermal plants (fuel oil, diesel), coal-fired plants, and clean energies like wind, photovoltaic, and hydroelectric. It also has two LNG regasification terminals with capacity for 350,000 cubic meters, over 800 electricians, 210 cranes, 333 light vehicles, and 37 emergency plants. Strategic Operation Centers were set up in the Baja California, Norte, Golfo Norte, Golfo Centro divisions, and national offices.

President Claudia Sheinbaum mentioned in her January 23 conference that the CFE will issue recommendations and a contingency plan. "Since this winter front was announced in Texas and northern Mexico, a series of contingencies have been taken," she said. Civil Protection recommended dressing in layers, insulating pipes, ventilating heaters, and reducing speed on icy roads. The number 071 is available for reports. They recall the 2021 impact, when a polar vortex caused CFE losses of 106.3 billion pesos due to gas shortages, but experts like Adrián Calcaneo note better preparation with 'winter packages' in Texas.

As of 12:00 on January 23, there are no critical impacts.

Apa yang dikatakan orang

Reactions on X to CFE's activation of the Emergency Response Steering Group for winter storm Fern are predominantly neutral and informative, featuring official announcements from CFE, SENER, and executives emphasizing preparedness with over 800 workers, equipment, and reserves deployed, and no disruptions reported yet. News outlets echo these updates, reflecting confidence in electricity supply amid cold weather risks.

Artikel Terkait

Illustration of coal, gas, and nuclear plants powering the U.S. amid Winter Storm Fern as wind and solar output drops.
Gambar dihasilkan oleh AI

Selama Badai Musim Dingin Fern, pembangkit fosil dan nuklir menyediakan sebagian besar daya AS saat energi terbarukan menurun, kata laporan

Dilaporkan oleh AI Gambar dihasilkan oleh AI Fakta terverifikasi

Laporan yang dipromosikan oleh organisasi nirlaba berorientasi konservatif Power the Future mengatakan bahwa pembangkit gas alam, batu bara, dan nuklir menghasilkan sebagian besar listrik AS selama Badai Musim Dingin Fern, sementara output angin dan surya turun selama jam-jam terdingin dan paling gelap badai. Temuan tersebut beredar di tengah dorongan balik baru dari administrasi Trump terhadap tenaga angin, termasuk langkah Desember 2025 untuk menangguhkan lima proyek angin lepas pantai di Pantai Timur.

The Federal Electricity Commission (CFE) continues monitoring winter storm 'Fern' to ensure power supply across Mexico. On January 24, 2026, outages in Chihuahua and Durango caused by the weather event were restored. The next day, energy demand was reported at stable levels with a wide reserve margin.

Dilaporkan oleh AI

The director of the Federal Electricity Commission (CFE), Emilia Esther Calleja Alor, appeared before the Energy Commission of the Chamber of Deputies to detail the company's achievements in 2025, as part of Claudia Sheinbaum's First Government Report. She highlighted subsidies for family tariffs, reduction in electrical interruptions, and infrastructure expansions. The presentation emphasized energy sovereignty and partnerships with the private sector.

Power outages affected more than 7000 users in the Buenos Aires metropolitan area minutes before 10 p.m. on Friday. Edesur's concession area was the hardest hit, with low voltage reports linked to heat and maintenance works. Storms are expected to arrive earlier than anticipated on Saturday, December 13, in the region, according to the National Meteorological Service.

Dilaporkan oleh AI

Four days after the extratropical cyclone that blacked out over 2 million properties in São Paulo, Enel reports restoration nearing normalcy with 76 external teams aiding efforts, though ~160,000 properties remain affected as of December 14. Federal threats loom over potential concession revocation amid ongoing criticism.

Extremely low temperatures down to -8 degrees Celsius have impacted crops and homes in Cofre de Perote, Veracruz, and Sierra de Guanaceví, Durango. Residents report a harsher-than-usual winter, with losses in agricultural production. Local authorities are preparing supports and prevention campaigns against the intense cold.

Dilaporkan oleh AI

An intense heatwave is straining the electrical grid in the Buenos Aires Metropolitan Area (AMBA), leaving over 30,000 users without power. Distributors Edesur and Edenor report widespread outages. Affected users can check service status on an interactive map from the National Electricity Regulatory Entity (ENRE).

 

 

 

Situs web ini menggunakan cookie

Kami menggunakan cookie untuk analisis guna meningkatkan situs kami. Baca kebijakan privasi kami untuk informasi lebih lanjut.
Tolak