Southern railway opens new subway near ranipet

The Southern Railway opened a new subway on Thursday to replace a manned level crossing at Lallikuppam village near Ranipet town. The facility, built at a cost of ₹6 crores, aims to ease traffic and improve access for vehicles and emergency services.

The subway replaces the manned railway level crossing LC-47. It was proposed nearly two decades ago and revived in 2024.

Previously motorists used a narrow British-era culvert while other vehicles took a detour of six kilometres via a road overbridge. The two-lane subway measures 240 metres long and 4.5 metres wide with a height of four metres.

It includes 10 LED street lights storm water drains reflectors and warning signages. The project connects surrounding villages to towns including Tiruttani Sholinghur Walajah Ranipet Katpadi Vellore and Chittoor.

Motorist R. Vembuli said the new subway will end a detour of at least 5-6 kms from surrounding villages to reach Ranipet town hospitals and government offices. Residents have requested resumption of bus services to the village.

Связанные статьи

Chennai Metro Rail's tunnelling work between Perambur Barracks and Purasawalkam has been delayed due to challenges in shaft construction and utility relocations. The 1.2 km stretch forms part of the larger phase II project.

Сообщено ИИ

The Centre’s high-level group has begun reviewing three proposed extensions to the Chennai Metro Rail network. The projects cover routes from the airport to Kilambakkam, Poonamallee to Parandur, and Koyambedu to Pattabiram via Avadi. Detailed project reports sent last year remain under examination by the Network Planning Group.

The Delhi Metro Rail Corporation has started work on a new 12.3 km underground corridor linking Inderlok and Indraprastha. Chief Minister Rekha Gupta inaugurated the project on Thursday. The extension forms part of the Magenta Line and aims to improve connectivity across the capital.

Сообщено ИИ

Hundreds of residents in Ranipet blocked a key road on Friday to protest frequent power cuts that have disrupted farming and daily life for over 1,500 families.

 

 

 

Этот сайт использует куки

Мы используем куки для анализа, чтобы улучшить наш сайт. Прочитайте нашу политику конфиденциальности для дополнительной информации.
Отклонить