Partial closures on Mexico City Metro Line B this weekend

Mexico City's Metro announced partial closures on Line B for maintenance work on Saturday, January 10, and Sunday, January 11, 2026. Service will operate in only two segments, with key stations closed and alternative transport provided. The works aim to enhance infrastructure for the line's 401,000 daily passengers.

The Collective Transport System (STC) Metro announced partial closures on Line B due to preventive and corrective maintenance work, as well as improvements to the elevated section, this weekend. Service will be limited to the segments from Ciudad Azteca to Villa de Aragón and from Buenavista to Morelos on Saturday, January 10, and Sunday, January 11, 2026.

The stations that will remain closed are San Lázaro, Flores Magón, Romero Rubio, Oceanía, Deportivo Oceanía, and Bosque de Aragón. To ease mobility, alternative service with Red de Transporte de Pasajeros (RTP) units will run from Morelos to Villa de Aragón. This will operate on Saturday from 6:00 to 24:00 and on Sunday from 7:00 to 24:00. Normal service on Line B, from Ciudad Azteca to Buenavista, will resume on Monday, January 12.

The works involve pouring four beams to increase rigidity in the track box, in the Oceanía-Romero Rubio and Romero Rubio-Flores Magón sections. Additionally, 125 obsolete wooden sleepers will be replaced with synthetic elements in the 11A/21 track setup, between Oceanía and Deportivo Oceanía. These actions are part of the ongoing improvement program for the elevated section and track system, led by STC head Adrián Rubalcava, following instructions from Mexico City Government Head Clara Brugada.

The Metro director requested user understanding, noting that these interventions will optimize service for the approximately 401,000 daily passengers on the line. Users are advised to plan their trips in advance.

Awọn iroyin ti o ni ibatan

President Sheinbaum cuts ribbon at inauguration of Mexico-Toluca 'El Insurgente' train after 12 years, crowd celebrates new 58km commuter line.
Àwòrán tí AI ṣe

Mexico-Toluca train completes operations after 12 years of construction

Ti AI ṣe iroyin Àwòrán tí AI ṣe

President Claudia Sheinbaum inaugurated on February 2, 2026, the final stage of the Mexico-Toluca Interurban Train, known as 'El Insurgente', a project started in 2014 with a 100 billion peso investment. This 57.7-kilometer line connects Toluca to western Mexico City, serving over 230,000 daily passengers. The project features seven stations and links to the Metro and Cablebús systems.

Starting Monday, February 9, the Mexico City Metro's Line 2 will begin remodeling works on 16 stations, altering hours at San Antonio Abad, Chabacano, and Viaducto. Service will split into two circuits, with free RTP bus service to ease disruptions. The project prepares the city for the 2026 World Cup.

Ti AI ṣe iroyin

The Mexico City government will extend Metrobus hours on some lines this Saturday, March 28, for the Estadio Banorte reopening featuring the Mexico vs Portugal match. Metrobus director Rosario Castro announced the measure on social media. No parking will be available for private vehicles at the venue.

Bogotá's mayor, Carlos Fernando Galán, announced that no proposals were received for the construction of metro line 2 along calle 72 after the deadline. However, the district administration assured that the works will not stop and will launch an international public tender in February. Proposals are expected in September, with construction starting in 2027.

Ti AI ṣe iroyin

The Bogotá Metro project has advanced to over 70% completion as of early 2026, including a key milestone of 10 kilometers of viaduct constructed. Mayor Carlos Fernando Galán highlighted this progress, alongside the ongoing dynamic tests in the Bosa workshop, as the project enters its final stretch.

Neighbors from Tlalpan and anti-World Cup groups plan to block Calzada de Tlalpan on Saturday, March 28, ahead of the Mexico vs. Portugal friendly at Estadio Banorte. The protest opposes the urban impacts of 2026 World Cup preparations, including rent hikes and gentrification. Authorities announced road closures starting at 1 p.m.

Ti AI ṣe iroyin

The Metropolitan Environmental Commission (CAMe) suspended the ozone air contingency in the Mexico City Metropolitan Area starting at 6:00 PM on Tuesday, February 17. This lifts the Double Hoy No Circula that was in effect for two days. The Hoy No Circula program will resume normal operations on Wednesday, February 18.

 

 

 

Ojú-ìwé yìí nlo kuki

A nlo kuki fun itupalẹ lati mu ilọsiwaju wa. Ka ìlànà àṣírí wa fun alaye siwaju sii.
Kọ