Space One delays Kairos rocket launch citing weather analysis

Tokyo-based startup Space One has postponed the launch of its Kairos small rocket's No. 3 unit until March, citing a detailed weather analysis. The rocket is set to carry five satellites, with the launch window running until March 25.

Space One, a Tokyo-based startup, has delayed the launch of the No. 3 unit of its Kairos small rocket, originally set for Wednesday. The rocket was scheduled to lift off between 11 a.m. and 11:20 a.m. from the company's Spaceport Kii site in Kushimoto, Wakayama Prefecture.

The firm stated that a new launch date will be announced two days in advance or earlier. Previous attempts with Kairos No. 1 and No. 2 units ended unsuccessfully in March 2024 and December of the same year, respectively.

Space One aims to achieve Japan's first satellite orbit insertion using a rocket developed entirely by the private sector.

Awọn iroyin ti o ni ibatan

Illustration of SpaceX Falcon 9 rocket launching South Korea's CAS500-2 satellite from Vandenberg Space Force Base.
Àwòrán tí AI ṣe

South Korean earth-observation satellite CAS500-2 successfully launched from US

Ti AI ṣe iroyin Àwòrán tí AI ṣe

South Korea's Compact Advanced Satellite (CAS) 500-2 successfully launched from Vandenberg Space Force Base in California on a SpaceX Falcon 9 rocket. The satellite entered low-Earth orbit and made first contact with a ground station in Norway. The Korea AeroSpace Administration (KASA) confirmed it is operating normally.

China's commercial space company CAS Space successfully debuted its Kinetica 2 carrier rocket on Monday, launching from the Jiuquan Satellite Launch Center and placing the New March 02 experimental cargo spaceship and two satellites into preset orbits. The mission marks the first use of a commercial rocket in China's manned space program.

Ti AI ṣe iroyin

CAS Space launched its Kinetica 1 rocket from the Jiuquan Satellite Launch Center on Monday morning, successfully placing eight remote-sensing satellites into orbit.

NASA's Artemis II mission lifted off successfully on April 1, 2026, from Kennedy Space Center in Florida, sending astronauts Reid Wiseman, Victor Glover, Christina Koch, and Jeremy Hansen aboard the Orion spacecraft for the first crewed Moon flyby since Apollo 17. Powered by the Space Launch System (SLS) rocket, the 10-day test flight will validate critical systems for future lunar landings and Mars missions, looping around the Moon's far side.

Ti AI ṣe iroyin

NASA has contracted a startup to launch a robotic spacecraft that will grab the aging Swift observatory and raise its orbit before it falls too low. The Link servicing satellite is set to fly on the final Pegasus rocket later this month.

Ojú-ìwé yìí nlo kuki

A nlo kuki fun itupalẹ lati mu ilọsiwaju wa. Ka ìlànà àṣírí wa fun alaye siwaju sii.
Kọ