Cycle bridge

Fuatilia

Traffic on E22 was closed late Friday evening between Kronetorp and Lund Norra to lift the first of two new green pedestrian and cycle bridges into place over the motorway in Lund. Work was delayed by darkness and cold but the bridge was in position by 22:00. Lund residents must wait until the end of June to use it.

Ojú-ìwé yìí nlo kuki

A nlo kuki fun itupalẹ lati mu ilọsiwaju wa. Ka ìlànà àṣírí wa fun alaye siwaju sii.
Kọ