Terpel acquires solar photovoltaic plant in Norte de Santander

Organización Terpel has signed a contract to acquire 100% of the shares in Pétalo del Norte de Santander I, a 26.4 MWp solar photovoltaic plant. The deal involves Generadora 205 S.L. and Erco Energía S.A.S. as sellers, aiming to advance Colombia's energy transition.

Organización Terpel announced the acquisition of 100% of the shares in Pétalo del Norte de Santander I, a new solar photovoltaic plant with an installed capacity of 26.4 MWp. The transaction was conducted with Generadora 205 S.L., a Spanish company subsidiary to Climate Fund Managers, and Erco Energía S.A.S., a Colombian firm. Terpel also secured 100% of the fiduciary rights in the autonomous patrimony linked to the plant.

The plant will connect to the local energy distribution system to feed into the national interconnected grid, capable of generating enough power for nearly 24,000 households. Juan Daniel Rueda, Terpel's new mobility manager, stated: "as a Country Ally, this second solar park reflects our determination to advance toward a cleaner energy matrix and position Terpel as a relevant actor in energy solutions." He added: "This acquisition demonstrates our ability to grow in new segments and aligns with our vision of consolidating as a more innovative, sustainable company with a diversified portfolio that generates long-term value."

The deal was approved by Terpel's Board of Directors in its regular sessions and is subject to review by the competition authority, after which it will be disclosed to the public market. This move supports Terpel's mission to encourage the expansion of non-polluting renewable energy sources and diversify its income streams, in line with the company's strategic plan.

Articoli correlati

Photo of Almaraz nuclear plant with executives submitting extension request documents to officials, illustrating the formal bid to extend operations until 2030.
Immagine generata dall'IA

I proprietari di Almaraz chiedono formalmente l'estensione fino al 2030

Riportato dall'IA Immagine generata dall'IA

Iberdrola, Endesa e Naturgy hanno formalmente richiesto al Ministero per la Transizione Ecologica di prolungare la vita della centrale nucleare di Almaraz fino a giugno 2030. Il governo inoltrerà la richiesta al Consiglio per la Sicurezza Nucleare per la valutazione. Questa mossa arriva in mezzo a tensioni politiche ed economiche, con il sostegno regionale in vista delle elezioni in Estremadura.

The Electrificadora del Huila inaugurated the Granja Solar El Bote, built in 79 days with a $3.5 billion investment from its own resources, becoming the first photovoltaic plant by a public energy company in Colombia. Mines and Energy Minister Edwin Palma Egea attended the event and praised manager Nika Cuéllar's leadership. This project positions Huila as a leader in clean energies.

Riportato dall'IA

Emcali has received the environmental license from the Valle del Cauca Regional Autonomous Corporation to build the Mulaló Solar Park, the largest photovoltaic project in southwestern Colombia. This approval marks a key step in the region's energy transition, with a 69.9 MWp capacity that will benefit around 50,000 households.

Grupo Carso, di proprietà di Carlos Slim, ha acquistato il 100% di Fieldwood Mexico B.V. dalla società russa Lukoil per 270 milioni di dollari, assumendo anche un debito di 330 milioni di dollari. L’affare, effettuato tramite la controllata Zamajal, dà all’azienda il pieno controllo dei campi petroliferi Ichalkil e Pokoch, situati al largo della costa di Campeche. La transazione necessita ancora di approvazioni regolatorie in Messico e Stati Uniti.

Riportato dall'IA

Gli azionisti di Talgo hanno approvato la ristrutturazione finanziaria che permette al Governo basco, Sidenor e SEPI di assumere il controllo dell’azienda. L’accordo prevede l’uscita di Trilantic e l’ingresso di nuovi investitori baschi e statali. Il processo mira a stabilizzare l’azienda dopo due anni di incertezza.

Ecopetrol reported $23.8 billion in contracts for goods and services in 2025, a 4.8% increase from 2024. Of that amount, 96% went to national providers, bolstering the local industry. The approach aims to support projects and operations across various regions of the country.

Riportato dall'IA

Migliaia di persone si sono radunate a mezzogiorno a Santiago di Compostela contro la macro-fabbrica di polpa Altri a Palas de Rei, in attesa dell'autorizzazione della Xunta, per difendere il futuro della Galizia. Organizzata da piattaforme come Ulloa Viva ed En Defensa da Ría de Arousa, la protesta ripete il massiccio rifiuto dell'anno scorso con il sostegno dei partiti di opposizione e degli ambientalisti. Alla fine, hanno chiesto alla Xunta di negare il permesso ambientale.

 

 

 

Questo sito web utilizza i cookie

Utilizziamo i cookie per l'analisi per migliorare il nostro sito. Leggi la nostra politica sulla privacy per ulteriori informazioni.
Rifiuta