Terpel acquires solar photovoltaic plant in Norte de Santander

Organización Terpel has signed a contract to acquire 100% of the shares in Pétalo del Norte de Santander I, a 26.4 MWp solar photovoltaic plant. The deal involves Generadora 205 S.L. and Erco Energía S.A.S. as sellers, aiming to advance Colombia's energy transition.

Organización Terpel announced the acquisition of 100% of the shares in Pétalo del Norte de Santander I, a new solar photovoltaic plant with an installed capacity of 26.4 MWp. The transaction was conducted with Generadora 205 S.L., a Spanish company subsidiary to Climate Fund Managers, and Erco Energía S.A.S., a Colombian firm. Terpel also secured 100% of the fiduciary rights in the autonomous patrimony linked to the plant.

The plant will connect to the local energy distribution system to feed into the national interconnected grid, capable of generating enough power for nearly 24,000 households. Juan Daniel Rueda, Terpel's new mobility manager, stated: "as a Country Ally, this second solar park reflects our determination to advance toward a cleaner energy matrix and position Terpel as a relevant actor in energy solutions." He added: "This acquisition demonstrates our ability to grow in new segments and aligns with our vision of consolidating as a more innovative, sustainable company with a diversified portfolio that generates long-term value."

The deal was approved by Terpel's Board of Directors in its regular sessions and is subject to review by the competition authority, after which it will be disclosed to the public market. This move supports Terpel's mission to encourage the expansion of non-polluting renewable energy sources and diversify its income streams, in line with the company's strategic plan.

Makala yanayohusiana

Photo of Almaraz nuclear plant with executives submitting extension request documents to officials, illustrating the formal bid to extend operations until 2030.
Picha iliyoundwa na AI

Almaraz owners formally request extension until 2030

Imeripotiwa na AI Picha iliyoundwa na AI

Iberdrola, Endesa, and Naturgy have formally requested the Ministry for Ecological Transition to extend the Almaraz nuclear plant's life until June 2030. The government will forward the request to the Nuclear Safety Council for evaluation. This move comes amid political and economic tensions, with regional support ahead of elections in Extremadura.

The Electrificadora del Huila inaugurated the Granja Solar El Bote, built in 79 days with a $3.5 billion investment from its own resources, becoming the first photovoltaic plant by a public energy company in Colombia. Mines and Energy Minister Edwin Palma Egea attended the event and praised manager Nika Cuéllar's leadership. This project positions Huila as a leader in clean energies.

Imeripotiwa na AI

Emcali has received the environmental license from the Valle del Cauca Regional Autonomous Corporation to build the Mulaló Solar Park, the largest photovoltaic project in southwestern Colombia. This approval marks a key step in the region's energy transition, with a 69.9 MWp capacity that will benefit around 50,000 households.

Grupo Carso, owned by Carlos Slim, purchased 100 percent of Fieldwood Mexico B.V. from the Russian company Lukoil for 270 million dollars, while also assuming a 330 million dollar debt. The deal, executed through subsidiary Zamajal, gives the company full control of the Ichalkil and Pokoch oil fields, located off the coast of Campeche. The transaction still needs regulatory approvals in Mexico and the United States.

Imeripotiwa na AI

Talgo's shareholders have approved the financial restructuring allowing the Basque Government, Sidenor, and SEPI to take control of the company. The deal involves Trilantic's exit and entry of new Basque and state investors. The process aims to stabilize the firm after two years of uncertainty.

Ecopetrol reported $23.8 billion in contracts for goods and services in 2025, a 4.8% increase from 2024. Of that amount, 96% went to national providers, bolstering the local industry. The approach aims to support projects and operations across various regions of the country.

Imeripotiwa na AI

Thousands of people rallied at noon in Santiago de Compostela against Altri's macro pulp plant in Palas de Rei, pending Xunta authorization, to defend Galicia's future. Organized by platforms like Ulloa Viva and En Defensa da Ría de Arousa, the protest repeats last year's massive rejection with support from opposition parties and environmentalists. At the end, they demanded the Xunta deny the environmental permit.

Alhamisi, 12. Mwezi wa pili 2026, 02:24:06

Tobacco farmers in Villa Clara donate solar modules to vital centers

Ijumaa, 6. Mwezi wa pili 2026, 16:22:17

EPM announces $1.1 trillion modernization of energy substations

Jumatano, 4. Mwezi wa pili 2026, 04:18:01

REC Solar and Trinchero Family Estates electrify winemaking with solar power

Jumamosi, 31. Mwezi wa kwanza 2026, 03:35:47

GeoPark acquires Frontera Energy assets to triple its production

Jumatano, 28. Mwezi wa kwanza 2026, 05:03:13

Ecopetrol evaluates alternatives amid Ecuador's 900% tariff hike

Jumatatu, 12. Mwezi wa kwanza 2026, 10:19:47

MGEN denies acquiring shares in Leviste's solar firm

Ijumaa, 9. Mwezi wa kwanza 2026, 08:47:46

Leandro Leviste sells SPNEC shares to Meralco

Jumamosi, 20. Mwezi wa kumi na mbili 2025, 06:14:25

Israeli company expands Spain's largest wind farm despite restrictions

Jumamosi, 13. Mwezi wa kumi na mbili 2025, 20:44:50

Psus form joint ventures with states to overcome solar land hurdles

Ijumaa, 28. Mwezi wa kumi na moja 2025, 06:53:36

Petro demands resignation at Ecopetrol over corruption case

 

 

 

Tovuti hii inatumia vidakuzi

Tunatumia vidakuzi kwa uchambuzi ili kuboresha tovuti yetu. Soma sera ya faragha yetu kwa maelezo zaidi.
Kataa