JR Joban Line suspended due to Ueno Station power outage

A power outage near Ueno Station in Tokyo around 7 a.m. on January 30 led to a partial suspension of JR Joban Line services. East Japan Railway (JR East) attributed the issue to a broken overhead wire, with operations not expected to resume until at least 2 p.m.

A power outage struck near JR Ueno Station in Tokyo around 7 a.m. on Friday, January 30, 2026, causing partial suspension of operations on the Joban Line. According to East Japan Railway, or JR East, the incident was due to a broken overhead line, which also briefly halted services on the Utsunomiya and Takasaki lines before they resumed after 8 a.m. As of 11 a.m., Joban Line trains remained suspended between Shinagawa Station in Tokyo and Abiko Station in Chiba Prefecture, while rapid services were stopped between Shinagawa and Matsudo Station in Chiba. JR East instructed passengers on four trains stranded between stations to walk along the tracks to the nearest stations. Services are not expected to resume until at least 2 p.m. This follows a January 16 incident where the Yamanote Line was suspended for about eight hours due to construction errors at night, raising questions about JR East's operational reliability. The outage significantly disrupted commuters, forcing many to seek alternative transport.

ተያያዥ ጽሁፎች

A bustling German train station with Deutsche Bahn trains resuming service after a disruption, passengers boarding in the early morning.
በ AI የተሰራ ምስል

Deutsche Bahn resumes train services after nationwide disruption

በAI የተዘገበ በ AI የተሰራ ምስል

A radio fault in the digital train radio GSM-R halted all train services across Germany late Tuesday evening. The issue was resolved overnight, but delays persist.

The Tokyo Metro Ginza Line suspended service across its entire route after smoke was reported at Asakusa Station early on April 22, but resumed full operations around 7:20 p.m. after about 13 hours. The smoke stemmed from damage to a cable in station equipment. Service between Asakusa and Mitsukoshimae stations took the longest to restore.

በAI የተዘገበ

Roads, train stations and airports in Japan congested on Saturday as the five-day Golden Week stretch began. Travelers headed to hometowns or domestic and overseas vacations. JR East reported disruptions on the Yamagata Shinkansen due to strong winds and a fallen tree.

A regional train carrying over 300 passengers broke down on Sunday evening in Upper Bavaria and was fully evacuated. The line between Ingolstadt and Nuremberg was temporarily closed.

በAI የተዘገበ

The power outage in Sumatra on May 22, 2026, has prompted calls to strengthen the transmission network and provide compensation to customers.

ይህ ድረ-ገጽ ኩኪዎችን ይጠቀማል

የእኛን ጣቢያ ለማሻሻል ለትንታኔ ኩኪዎችን እንጠቀማለን። የእኛን የሚስጥር ፖሊሲ አንብቡ የሚስጥር ፖሊሲ ለተጨማሪ መረጃ።
ውድቅ አድርግ