IDA launches 414 ready-to-operate industrial units across 11 governorates

Egypt's Industrial Development Authority (IDA) has launched 414 fully equipped industrial units ready for immediate delivery across 12 complexes in 11 governorates, as part of the Ministry of Industry's strategy to localize manufacturing.

The Industrial Development Authority (IDA) announced the launch of 414 fully equipped industrial units ready for immediate operations across 12 industrial complexes in 11 governorates. This move supports the Ministry of Industry's efforts to localize manufacturing and bolster domestic supply chains.

The units are located in zones including Bayad Al Arab, West Girga, Hou, Arab Al Awamer, Al Matahra, Merghem 2, Al Baghdadi, Metal and Concrete Complex, Al Genena, Al Shobak, Sadat, and El Mahalla El Kubra. Sizes range from 48 sqm to 792 sqm, covering sectors such as food processing, engineering, chemicals, plastics, textiles, building materials, metals, pharmaceuticals, and leather.

Nahed Youssef, IDA Chairperson, stated the units offer "flexible options for small investors and entrepreneurs seeking ready-to-operate industrial spaces with minimal start-up requirements." They are available for ownership or leasing, with incentives like simplified licensing and financing from the Micro, Small, and Medium Enterprise Development Agency.

Applications open online via the Egypt Digital Industrial Platform from April 5 to 19, 2026, including technical and marketing support. Youssef emphasized that supporting small-scale industries is key to balanced regional development, integration between manufacturers, and reducing import reliance.

Relaterede artikler

The Ministry of Industry has announced a new package of grace periods and incentives to support distressed industrial projects that have exceeded their approved implementation timelines, aiming to accelerate production, protect manufacturers, and maximize the use of industrial land. These measures, to be implemented by the Industrial Development Authority, will remain in effect until April 30, 2026.

Rapporteret af AI

Egypt’s Industrial Control Authority (ICA) submitted its Q1 2026 performance report to Minister of Industry Khaled Hashem, detailing inspections of 1,041 factories. The activities included issuing licenses and resolving complaints to bolster industrial oversight. ICA head Ihab Amin emphasized its role in ensuring standards compliance.

Prime Minister Mostafa Madbouly met with Minister of Industry Khaled Hashem in the New Administrative Capital to review the ministry's vision and work plan for the coming phase. Madbouly stressed that the industrial sector is among the government's top priorities, noting the momentum from recent economic reforms. Hashem presented a roadmap focused on increasing non-oil exports through several strategic pillars.

Rapporteret af AI

Industry Minister Khaled Hashem has issued Decision No. 73 of 2026, amending a previous decree to simplify factory leasing procedures in industrial zones. The change reduces the required operational period before leasing from three years to one year, while maintaining key conditions. This move aims to boost productivity and support investors.

 

 

 

Dette websted bruger cookies

Vi bruger cookies til analyse for at forbedre vores side. Læs vores privatlivspolitik for mere information.
Afvis