Tepco reports alert system error at Kashiwazaki-Kariwa plant

Tokyo Electric Power Company (Tepco) announced that an alert system failed to activate during a test operation for restarting the No. 6 reactor at its Kashiwazaki-Kariwa nuclear plant. The issue was detected on Friday, raising concerns about the planned restart on Tuesday.

Tokyo Electric Power Company Holdings (Tepco) revealed on Saturday that an alert system malfunctioned during a test operation on the previous day for the restart of the No. 6 reactor at its Kashiwazaki-Kariwa nuclear plant in Niigata Prefecture. The system is intended to activate when a control rod is withdrawn from the reactor while another rod is already out.

The issue was confirmed at 12:36 p.m., prompting an immediate halt to the test. Tepco is investigating the cause, noting that any delay in resolution could jeopardize the reactor's scheduled restart on Tuesday. This would mark the first restart of a Tepco nuclear reactor since the March 2011 accident at the tsunami-damaged Fukushima No. 1 plant.

The malfunction revives concerns over nuclear safety protocols. Tepco is conducting a thorough probe and preparing reports for regulatory authorities.

Articles connexes

Niigata Governor Hideyo Hanazumi announces restart of Kashiwazaki-Kariwa nuclear plant at press conference, with facility image projected behind.
Image générée par IA

Niigata approuve la remise en service de la plus grande centrale nucléaire du monde

Rapporté par l'IA Image générée par IA

Le gouverneur de Niigata, Hideyo Hanazumi, a approuvé vendredi la remise en service de la plus grande centrale nucléaire du monde, l'installation de Kashiwazaki-Kariwa. Il s'agit du premier redémarrage pour l'exploitant TEPCO depuis la catastrophe de Fukushima en 2011. Cette décision soutient les objectifs du Japon de réduire la dépendance aux combustibles fossiles et d'atteindre la neutralité carbone.

Tokyo Electric Power Company restarted reactor No. 6 at the Kashiwazaki-Kariwa nuclear plant after about 14 years, but suspended operations just six hours after achieving a critical state due to an alarm. This event, the company's first restart since the 2011 Fukushima disaster, highlights ongoing safety concerns in Japan's nuclear revival.

Rapporté par l'IA

Tokyo Electric Power Company restarted its No. 6 reactor at the Kashiwazaki-Kariwa nuclear power plant in Niigata Prefecture on Wednesday evening. This marks TEPCO's first reactor restart since the 2011 Fukushima accident, though local residents remain divided. Commercial operations are slated for February 26.

La recherche de deux ouvriers disparus suite à l'effondrement d'une tour de chaudière dans une centrale thermique à Ulsan est entrée dans son cinquième jour. Trois corps ont été retrouvés jusqu'à présent, dont un dimanche, tandis que quatre restent piégés. Les équipes de secours se sont temporairement retirées pour préparer la démolition des tours adjacentes avant d'utiliser des équipements lourds pour dégager les débris.

Rapporté par l'IA

A magnitude 7.5 earthquake struck off the coast of Aomori Prefecture, prompting a tsunami advisory that was lifted Tuesday morning. Thirty injuries and one residential fire were confirmed, as the government rushes to assess damage and conduct rescues. Warnings of aftershocks and an elevated risk of a megaquake persist.

A local train heading from Hiratsuka to Koga collided with a car at a level crossing on the JR Utsunomiya Line in Shiraoka, Saitama Prefecture, causing part of the train to derail. A person was trapped inside the car, with local police conducting rescue operations. The incident led to a suspension of services in both directions between Tokyo and Utsunomiya Stations.

Rapporté par l'IA

Following a launch scrub on December 17, Japan's JAXA launched its eighth H3 rocket on December 22, 2025, from Tanegashima Space Center, but suspended the live broadcast after the second-stage engine shut down prematurely. The rocket carries the Cabinet Office's Michibiki No. 5 satellite for Japan's Quasi-Zenith Satellite System (QZSS).

 

 

 

Ce site utilise des cookies

Nous utilisons des cookies pour l'analyse afin d'améliorer notre site. Lisez notre politique de confidentialité pour plus d'informations.
Refuser