Green bridge placed over E22 in Lund

Traffic on E22 was closed late Friday evening between Kronetorp and Lund Norra to lift the first of two new green pedestrian and cycle bridges into place over the motorway in Lund. Work was delayed by darkness and cold but the bridge was in position by 22:00. Lund residents must wait until the end of June to use it.

Trafikverket shut down all traffic on E22 through Lund between Kronetorp interchange and Lund Norra late Friday evening. The motorway fell silent as the new green pedestrian and cycle bridge was lifted into place. This marks the first of two planned bridge lifts.

Near Gastelyckan, Ulf Nicklasson passed the bridge without initially noticing the closure. "To be honest, I only just noticed now that it's empty," he said. He recalled the E22's inauguration as Sweden's first motorway, or autostrada as he called it: "Back then it was just concrete."

A small group of spectators gathered at Höjebromölla to watch. Work began immediately after the shutdown but was delayed by darkness and cold. Workers continued until the bridge was in position at 22:00.

Lund residents cannot use the bridge until the end of June. The second bridge lift remains pending.

Labaran da ke da alaƙa

Car pile-up on E22 near Sölvesborg due to sandstorm from strong winds; emergency services respond as five hospitalized.
Hoton da AI ya samar

Five people hospitalized after pile-up on E22 near Sölvesborg

An Ruwaito ta hanyar AI Hoton da AI ya samar

Five people were taken to hospital after a major pile-up on the E22 in Blekinge near Sölvesborg on Monday. Strong winds blew sand that suddenly reduced visibility for drivers, according to witnesses. The road was closed in both directions for several hours.

On Tuesday, spectators gathered at Viktoriaslussen in Stockholm to watch the first section of a new cycle and pedestrian bridge being towed into Söderström. The 220-metre-long bridge, built in Poland, has been divided into six sections due to transport constraints. Installation work is now starting and is expected to take six weeks.

An Ruwaito ta hanyar AI

Trafikverket plans to replace the current combined road and railway bridge over Österdalälven at Oxberg in Mora with two separate bridges. The new bridges are scheduled for completion in autumn 2028 according to the project. The solution aims to create a modern and sustainable separation of traffic.

Police have issued fines to drivers who ignored the nighttime closure of Eriksbergsvägen in Uppsala, a measure put in place to let frogs, toads and newts cross safely during their spring migration.

An Ruwaito ta hanyar AI

A driver crashed into the guardrail on the E6 near Flädie just after midnight into Monday. The road was closed in the southbound direction. Rescue services finished at 00.40, with the road expected to reopen at 01.30.

The full closure of the A7 motorway and Elbtunnel in Hamburg has been lifted earlier than planned. The Autobahngesellschaft announced this on Sunday evening. Only the on- and off-ramp at Hamburg-Bahrenfeld northbound remains closed until 5am Monday.

An Ruwaito ta hanyar AI

Uppsala municipality has prepared a detailed plan for the new railway station in Bergsbrunna south of the city. The planning and building committee decided on Thursday to send the plan for consultation starting May 8. The station is set to handle 30,000 passengers per day when it opens in 2034.

 

 

 

Wannan shafin yana amfani da cookies

Muna amfani da cookies don nazari don inganta shafin mu. Karanta manufar sirri mu don ƙarin bayani.
Ƙi