Kura closes section of Eldoret Road for 4 months to facilitate bridge construction

The Kenya Urban Roads Authority has announced a four-month closure of part of Eldoret Road in Nairobi starting May 18 to build a new vehicular bridge over the Nairobi River.

The Kenya Urban Roads Authority stated on May 11 that the closure will run from 6 AM on Monday, May 18, to 6 PM on Friday, September 18. The measure will allow a contractor to construct a vehicular bridge across the Nairobi River.

Motorists have been advised to use alternative routes including parallel local streets in the Eastland area and connections via Ngong Road, Mbagathi Road, Lang’ata Road, and inner connector roads to reach Jogoo Road and other arterial routes. Traffic police officers and marshals will be deployed to manage flow along the affected corridor.

The project forms part of broader road beautification efforts in the capital by KURA and the Kenya National Highways Authority. Officials said the new bridge is expected to improve connectivity and cut travel delays for users once work finishes.

संबंधित लेख

Nairobi Water technicians celebrate restored water supply to flood-hit estates after pipeline repairs.
AI द्वारा उत्पन्न छवि

Nairobi Water resumes supply to six estates after pipeline repairs

AI द्वारा रिपोर्ट किया गया AI द्वारा उत्पन्न छवि

Nairobi Water has confirmed resumption of supply to Buruburu Phases 1 and 2, Kariobangi South and North, Dandora, and parts of Mathare after repairing a flood-damaged transmission pipeline along Outering Road. Services were disrupted by recent floods affecting thousands of homes. The company stated the pipeline has been fully restored.

Kenya Railways has announced the temporary closure of a section of Moi Avenue in Mombasa for emergency repairs on a railway bridge. The closure is scheduled for Sunday, March 1, 2026, lasting four hours from 6am to 10am. Motorists and commuters have been advised on alternative routes to avoid heavy congestion.

AI द्वारा रिपोर्ट किया गया

Motorists between Nairobi's Central Business District and Westlands can use the Nairobi Expressway toll-free for two nights due to ongoing construction on Waiyaki Way.

The Kenya National Highways Authority (KeNHA) has warned motorists against using the Chapareria-Morpus section of the Kitale-Morpus Road due to flooding. The stretch, approximately 1km from Morpus, is cut off and unsafe for vehicles, disrupting traffic between Chapareria and Sebit towards Lodwar. Authorities urge drivers to use alternative routes.

AI द्वारा रिपोर्ट किया गया

President William Ruto has announced that the Mau Mau Road project linking four counties is 60 percent complete and will finish within two years. He made the statement at a church event in A.I.C. Githumu, Kandara, Murang’a County. The government has allocated Ksh2 billion for the section through Murang’a.

The Kenya National Highways Authority (Kenha) has recirculated evacuation notices to traders operating within the road reserve along the Thika Superhighway in Delview, Kihunguro, and Allsops after ignoring earlier directives. Persistent non-compliance will lead to the clearance of illegal structures. This action supports highway rehabilitation and safety improvements.

AI द्वारा रिपोर्ट किया गया

The Kenya National Highways Authority (KeNHA) has cautioned motorists against using a section of the Eldama Ravine–Maji Mazuri–Molo Road due to flooding along the Molo River. Drivers are urged to exercise caution and use alternative routes amid heavy rains. The authority is monitoring the situation closely.

 

 

 

यह वेबसाइट कुकीज़ का उपयोग करती है

हम अपनी साइट को बेहतर बनाने के लिए विश्लेषण के लिए कुकीज़ का उपयोग करते हैं। अधिक जानकारी के लिए हमारी गोपनीयता नीति पढ़ें।
अस्वीकार करें