Adama clean water project inaugurated at cost of 6.2 billion birr

A clean water project built in Adama city at a cost of 6.2 billion birr has been inaugurated and opened for service. The project will benefit more than 1.1 million residents.

The Ministry of Water and Energy built the project in cooperation with the Oromia Region and Adama City Administration. The project includes 15 new groundwater sources.

It also features 10 large water reservoirs, 245 main distribution lines and a five-story administration office building. Saada Abdurehman, Speaker of the Oromia Caffee, said the project will sustainably address water supply questions.

Ambassador Asfaw Dingamo, State Minister of Water and Energy, stated that the government will continue building similar projects in all cities of the country. Dr. Milion Bekele, head of the Oromia Water and Energy Bureau, explained that the project uses modern equipment.

관련 기사

Prime Minister Abiy Ahmed cutting a ribbon at the Entoto Qebenna riverbank development inauguration, with Mayor Adanech Abiebie and a crowd.
AI에 의해 생성된 이미지

Prime Minister Abiy Inaugurates Entoto Qebenna River Development Project

AI에 의해 보고됨 AI에 의해 생성된 이미지

Prime Minister Abiy Ahmed inaugurated the Entoto Qebenna River and riverbank development project today. Mayor Adanech Abiebie said the project enhances the city's beauty.

South Ethiopia Regional State Administrator Tilahun Kebede has inaugurated development projects costing over 100 million birr in Yirgachefe town of Gedeo Zone.

AI에 의해 보고됨

Prime Minister Abiy Ahmed visited water supply and irrigation projects in Borana zone and said preparations are underway to harness agricultural potential for future generations.

Amhara regional president Arega Kebede announced the launch of construction for the Gondar Integrated Agro Industry Park. The park is set to serve as an economic hub for Gondar and surrounding areas.

AI에 의해 보고됨

Market centers valued at 1.3 billion Birr are being built in Ethiopia's Amhara Region.

The Addis Ababa City Administration cabinet has approved a draft budget of 502.27 billion birr for the 2026/27 fiscal year and sent it to the City Council. The proposal marks a 43.45 percent increase from the previous year's 350.13 billion birr budget.

AI에 의해 보고됨

Addis Ababa Mayor Adanech Abebe has launched the 2018 E.C. summer cleaning campaign.

 

 

 

이 웹사이트는 쿠키를 사용합니다

사이트를 개선하기 위해 분석을 위한 쿠키를 사용합니다. 자세한 내용은 개인정보 보호 정책을 읽으세요.
거부