Hedemora council to soon decide on Vasahallen pool renovation

Hedemora's municipal council will decide in just over a week on renovating Vasahallen's swimming pool at a cost exceeding 11 million kronor. The proposal includes new pool lining, concrete repairs, and ventilation replacement. The matter was reported by sodran.se.

Hedemora's municipal council faces a key decision on the future of Vasahallen's swimming pool. In just over a week, politicians will vote on a major renovation estimated at over 11 million kronor, according to sodran.se.

The proposal covers several upgrades: new lining for the pool basin, repairs to the concrete, and a full replacement of the ventilation system. These measures aim to ensure the facility's long-term viability.

The article, by Eric Salomonsson and published in Dala-Demokraten, cites sodran.se as the source for the proposal details.

관련 기사

Stockholm is set to replace the aging Hovet with a modern hockey arena for Djurgården and AIK. The project, known as Nya Hovet, involves two possible locations and is expected to begin construction between 2029 and 2030.

AI에 의해 보고됨

Hedemora municipality has launched an investigation after criticism over payments for snow protection at Klosterhallen despite the sale. The building is now owned by a private person but remains in use by the municipality.

Region Dalarna’s majority presented a 2027 budget on Monday that includes 41.6 million kronor to stabilize the Cosmic medical records system.

AI에 의해 보고됨

Social Democrats and Moderates promised before the last election to keep Slättabadet if they gained power. After the election they decided not to keep the promise.

 

 

 

이 웹사이트는 쿠키를 사용합니다

사이트를 개선하기 위해 분석을 위한 쿠키를 사용합니다. 자세한 내용은 개인정보 보호 정책을 읽으세요.
거부