Vale pit overflow disrupts operations in Minas Gerais

A Vale mining pit overflowed in the early hours of January 25, 2026, in Ouro Preto, Minas Gerais, flooding CSN facilities in Congonhas without any injuries reported. The spill of water and sediments halted operations and water supply in the area, raising alarms seven years after the Brumadinho disaster. Authorities and the company are investigating the causes, confirming that dams remain safe.

In the early hours of January 25, 2026, a flooded pit at the Fábrica mine in Ouro Preto, Minas Gerais, overflowed with water and sediments, affecting nearby areas between Ouro Preto and Congonhas. The flow caused a mud flood that inundated offices, workshops, and the stockroom of the Companhia Siderúrgica Nacional (CSN), located on lower terrain, resulting in about 1.5 meters of flooding. This prompted the preventive evacuation of around 200 workers and the suspension of operations, including water intake.

Vale issued a statement clarifying that the incident did not involve dikes or dams, which remain stable and monitored around the clock. "The flow reached some areas of a company in the region. People and the local community were not affected," the company said, prioritizing environmental protection and notifying competent authorities.

Congonhas Mayor Anderson Cabido (PSB) reported in a video that over 200,000 cubic meters of water escaped the area, carrying minerals and reaching the Goiabeiras stream, which supplies the Maranhão River. "There were significant environmental damages that need to be investigated and held accountable," he stated, emphasizing the direct impact on his municipality.

The Movimento dos Atingidos por Barragens (MAB) reported that the episode disrupted water supply and local operations, with members monitoring the situation alongside residents and officials. The Minas Gerais government deployed Civil Defense, Firefighters, Military Police, and the Environment Secretariat to assess damages.

The event marks seven years since the Brumadinho dam rupture on January 25, 2019, which killed 272 people and caused ongoing contamination in the Paraopeba River basin, affecting at least 2,400 hectares with tailings until 2022. Though without casualties, the overflow heightens concerns over mining structure safety in the region.

관련 기사

Brazilian Army soldiers aid flood victims amid destruction in Juiz de Fora after rains kill 41.
AI에 의해 생성된 이미지

Juiz de Fora receives military aid after rains leave 41 dead

AI에 의해 보고됨 AI에 의해 생성된 이미지

Heavy rains in Juiz de Fora, Minas Gerais, caused at least 41 deaths and 17 missing, plus thousands homeless. The city declared a state of public calamity and is receiving support from the Brazilian Army. Residents report a lack of training for emergencies, while school shelters house affected families.

The Minas Gerais government raised the fine on miner Vale from R$ 1.7 million to R$ 3.3 million due to drainage system failures in two mines that experienced leaks on January 25, 2026. The decision accounts for the company's history of recidivism and contrasts with Vale's claim that no tailings were transported. Measures include suspending operations at one mine to prevent environmental risks.

AI에 의해 보고됨

Brazil's Federal Public Prosecutor's Office has sued mining giant Vale, seeking to freeze R$1 billion in assets and halt operations at the Fábrica Mine in Minas Gerais after a spill of 262,000 cubic meters of water and sediments that caused environmental damage. The incident took place on January 25, 2026, impacting streams feeding the Maranhão and Paraopeba rivers. The lawsuit points to violations of environmental licenses and delays in notifying authorities.

São Paulo's main reservoir system, Cantareira, saw a 0.1% drop in stored volume on January 1, 2026, reaching 20.1%, despite recent rains. This triggered the 'restriction' level, capping water withdrawals at 23 cubic meters per second, supplemented by the Rio Paraíba do Sul. Officials state there is no immediate risk of water rationing.

AI에 의해 보고됨

São Paulo's Public Prosecutor's Office announced an investigation into the overcrowding at pre-Carnival megablocks on Consolação Street on February 8, which led to tumults and medical treatments. Experts criticize planning failures by the city hall, while Mayor Ricardo Nunes downplays the incident as a success.

A dubious reclamation operation at the old Grootvlei gold mine is endangering the ecologically vital Blesbokspruit wetland in Gauteng. Journalists' inquiries prompted the Department of Water and Sanitation to investigate, revealing the company lacked necessary water authorisation. Enforcement actions are now underway to protect this Ramsar-designated site.

AI에 의해 보고됨

Indigenous groups occupying Cargill's headquarters in Santarém, Pará, have decided to continue their indefinite protest against the Tapajós river dredging plan, claiming the government abandoned negotiations. Despite this, the federal government announced the suspension of the bidding process for hiring a company responsible for the works. The action, lasting 16 days, demands the revocation of a decree including the waterway in a privatization program.

 

 

 

이 웹사이트는 쿠키를 사용합니다

사이트를 개선하기 위해 분석을 위한 쿠키를 사용합니다. 자세한 내용은 개인정보 보호 정책을 읽으세요.
거부