Tepco restarts power transmission from Kashiwazaki-Kariwa plant after 14 years

Tokyo Electric Power Company Holdings (Tepco) began sending electricity from its Kashiwazaki-Kariwa nuclear plant in Niigata Prefecture to the Tokyo metropolitan area for the first time in about 14 years on Monday. The No. 6 reactor, restarted earlier this year, started generating and transmitting power at 10 p.m. Further inspections are planned ahead of potential commercial operations.

Tokyo Electric Power Company Holdings (Tepco) on Monday restarted electricity transmission from its Kashiwazaki-Kariwa nuclear power plant in Niigata Prefecture to the Tokyo metropolitan area, marking the first such operation in about 14 years. The No. 6 reactor at the plant, a boiling-water type identical to those at the tsunami-damaged Fukushima No. 1 plant, began generating power and sending it out at 10 p.m.

The 1.35-million-kilowatt reactor was originally set to restart on January 20, but a delay of one day occurred due to an issue detected during a pre-startup control rod withdrawal test. Shortly after restarting, an alarm related to a control rod movement device triggered, leading to another halt. Tepco resolved a setting problem with the alarm and restarted the reactor on February 9.

Tepco plans to raise the reactor's output to 50% before temporarily shutting it down on Friday or later for turbine equipment inspections. The reactor is expected to resume operations in early March, followed by a final inspection on March 18, after which commercial operations could begin pending approval from the Nuclear Regulation Authority.

All reactors at Kashiwazaki-Kariwa were idled by March 2012 following the March 2011 meltdown at Fukushima. This restart represents the first reactivation of a Tepco boiling-water reactor since that disaster.

Relaterte artikler

Tokyo Electric Power Company Holdings announced that its No. 6 reactor at the Kashiwazaki-Kariwa nuclear power station in Niigata Prefecture has begun transmitting electricity to the Tokyo metropolitan area for the first time in 14 years. The company conducted a grid connection test early Monday morning and started full-scale transmission in the evening. Commercial operations are scheduled for March 18.

Rapportert av AI

The No. 6 reactor at the Kashiwazaki-Kariwa nuclear power plant in Niigata Prefecture restarted on Tuesday after a scheduled brief halt for inspections. Tokyo Electric Power Company Holdings reactivated it at 6:25 a.m., finding no issues in turbine-related equipment. This marks the first electricity generation in about 14 years for the unit.

Tokyo Electric Power Company Holdings unveiled a new robot arm on Wednesday for the project to remove nuclear fuel debris from its tsunami-crippled Fukushima No. 1 nuclear plant. The 22-meter-long arm can grab debris from a wider area than the previously used fishing rod-like devices. Tepco plans to begin setting it up next month and start the third trial at the No. 2 reactor this autumn.

Rapportert av AI

Japan's government plans to temporarily lift restrictions on coal-fired power plants to address an energy crunch from the Middle East war. Officials presented the plan to a panel of experts, who approved it, the industry ministry said. The measure allows full operation of older, less efficient coal plants for a year starting in the new fiscal year from April.

 

 

 

Dette nettstedet bruker informasjonskapsler

Vi bruker informasjonskapsler for analyse for å forbedre nettstedet vårt. Les vår personvernerklæring for mer informasjon.
Avvis