Tepco restarts power transmission from Kashiwazaki-Kariwa plant after 14 years

Tokyo Electric Power Company Holdings (Tepco) began sending electricity from its Kashiwazaki-Kariwa nuclear plant in Niigata Prefecture to the Tokyo metropolitan area for the first time in about 14 years on Monday. The No. 6 reactor, restarted earlier this year, started generating and transmitting power at 10 p.m. Further inspections are planned ahead of potential commercial operations.

Tokyo Electric Power Company Holdings (Tepco) on Monday restarted electricity transmission from its Kashiwazaki-Kariwa nuclear power plant in Niigata Prefecture to the Tokyo metropolitan area, marking the first such operation in about 14 years. The No. 6 reactor at the plant, a boiling-water type identical to those at the tsunami-damaged Fukushima No. 1 plant, began generating power and sending it out at 10 p.m.

The 1.35-million-kilowatt reactor was originally set to restart on January 20, but a delay of one day occurred due to an issue detected during a pre-startup control rod withdrawal test. Shortly after restarting, an alarm related to a control rod movement device triggered, leading to another halt. Tepco resolved a setting problem with the alarm and restarted the reactor on February 9.

Tepco plans to raise the reactor's output to 50% before temporarily shutting it down on Friday or later for turbine equipment inspections. The reactor is expected to resume operations in early March, followed by a final inspection on March 18, after which commercial operations could begin pending approval from the Nuclear Regulation Authority.

All reactors at Kashiwazaki-Kariwa were idled by March 2012 following the March 2011 meltdown at Fukushima. This restart represents the first reactivation of a Tepco boiling-water reactor since that disaster.

Makala yanayohusiana

Tokyo Electric Power Company Holdings announced that its No. 6 reactor at the Kashiwazaki-Kariwa nuclear power station in Niigata Prefecture has begun transmitting electricity to the Tokyo metropolitan area for the first time in 14 years. The company conducted a grid connection test early Monday morning and started full-scale transmission in the evening. Commercial operations are scheduled for March 18.

Imeripotiwa na AI

The No. 6 reactor at the Kashiwazaki-Kariwa nuclear power plant in Niigata Prefecture restarted on Tuesday after a scheduled brief halt for inspections. Tokyo Electric Power Company Holdings reactivated it at 6:25 a.m., finding no issues in turbine-related equipment. This marks the first electricity generation in about 14 years for the unit.

Fifteen years after the 2011 disaster, the 21 industrial parks built in Fukushima's coastal municipalities to revitalize the region, backed by generous government incentives, are displaying both successes and ongoing struggles.

Imeripotiwa na AI

Tokyo Electric Power Company Holdings unveiled a new robot arm on Wednesday for the project to remove nuclear fuel debris from its tsunami-crippled Fukushima No. 1 nuclear plant. The 22-meter-long arm can grab debris from a wider area than the previously used fishing rod-like devices. Tepco plans to begin setting it up next month and start the third trial at the No. 2 reactor this autumn.

Ijumaa, 27. Mwezi wa tatu 2026, 01:26:48

Japan to ease coal power restrictions amid Mideast energy crisis

Jumapili, 22. Mwezi wa tatu 2026, 06:13:17

Kashiwazaki-Kariwa nuclear reactor resumes power generation

Ijumaa, 13. Mwezi wa tatu 2026, 03:16:43

Sanyo Shinkansen services suspended between Hakata and Hiroshima due to wire obstruction

Jumatano, 4. Mwezi wa tatu 2026, 05:29:50

US regulator approves TerraPower's first nuclear reactor construction

Jumanne, 17. Mwezi wa pili 2026, 07:50:33

U.S. firm plans training hub for Fukushima debris removal by 2029

Jumapili, 15. Mwezi wa pili 2026, 00:30:36

TEPCO fixes instrument glitch at Kashiwazaki-Kariwa nuclear plant

Jumanne, 27. Mwezi wa kwanza 2026, 23:54:19

JR East resumes train services between Tokyo and Atami after accident

Jumatatu, 26. Mwezi wa kwanza 2026, 11:00:43

Japan approves Tepco's ¥3.1 trillion cost cuts in 10-year plan

Jumamosi, 24. Mwezi wa kwanza 2026, 00:08:13

Tepco suspends Kashiwazaki-Kariwa reactor restart after alarm

Jumatano, 21. Mwezi wa kwanza 2026, 15:28:41

TEPCO restarts Kashiwazaki-Kariwa No. 6 reactor after delay

 

 

 

Tovuti hii inatumia vidakuzi

Tunatumia vidakuzi kwa uchambuzi ili kuboresha tovuti yetu. Soma sera ya faragha yetu kwa maelezo zaidi.
Kataa