Boliden has announced a 700 million kronor write-down of assets at the Garpenberg mine, damaged by seismic activity and a collapse in March that led to parts of the mine closing through 2026. The write-down covers infrastructure and equipment affected by the events.

Сообщено ИИ

Eskom has extended negotiations over a temporary 62c/kWh electricity tariff for ferrochrome smelters until after Easter on 7 April 2026. The measure aims to prevent mass job losses at producers like Glencore-Merafe and Samancor, but the manganese and silicon sectors are excluded. Eskom chief Dan Marokane backed the proposal with specific conditions.

Этот сайт использует куки

Мы используем куки для анализа, чтобы улучшить наш сайт. Прочитайте нашу политику конфиденциальности для дополнительной информации.
Отклонить