mining

关注

Boliden has announced a 700 million kronor write-down of assets at the Garpenberg mine, damaged by seismic activity and a collapse in March that led to parts of the mine closing through 2026. The write-down covers infrastructure and equipment affected by the events.

由 AI 报道

Eskom has extended negotiations over a temporary 62c/kWh electricity tariff for ferrochrome smelters until after Easter on 7 April 2026. The measure aims to prevent mass job losses at producers like Glencore-Merafe and Samancor, but the manganese and silicon sectors are excluded. Eskom chief Dan Marokane backed the proposal with specific conditions.

此网站使用 cookie

我们使用 cookie 进行分析以改进我们的网站。阅读我们的 隐私政策 以获取更多信息。
拒绝