Shell resumes production at Bonga after FPSO maintenance

Shell has resumed production at the Bonga field following maintenance on its FPSO vessel. This step marks the return to normal operations after the scheduled upkeep.

Shell Petroleum Development Company has announced the resumption of production at the Bonga oil field. The restart comes after the completion of maintenance works on the Floating Production Storage and Offloading (FPSO) unit. According to reports, the maintenance was routine and aimed at ensuring safety and efficiency. Production activities are now back online, contributing to Nigeria's oil output.

相关文章

Damaged Ras Laffan LNG facilities in Qatar after Iranian attack, with QatarEnergy CEO addressing the media amid smoke and wreckage.
AI 生成的图像

QatarEnergy eyes force majeure on LNG contracts after Iran attack damage

由 AI 报道 AI 生成的图像

Following Iran's attack on Qatar's Ras Laffan LNG facilities, QatarEnergy CEO Saad al-Kaabi warned of declaring force majeure on long-term contracts, including those with South Korea's KOGAS, as repairs to damaged production trains could take three to five years, sidelining 17% of export capacity. South Korean officials downplayed supply risks due to alternatives.

The Belayim offshore 133 well in the Sinai fields has commenced crude oil production at an initial rate of 1,500 barrels per day, according to a statement from the Ministry of Petroleum and Mineral Resources. This represents the first results of Italy's Eni new investment work programme in the Gulf of Suez, Sinai, and Delta regions.

由 AI 报道

SK Innovation E&S, the energy unit of South Korea's SK Group, has begun production at the Barossa gas field in Australia, a project it invested in 14 years ago. This marks the first time a Korean private-sector company has achieved LNG production through an overseas resource development project. The initial output is expected to secure 1.3 million tons of LNG annually, equivalent to about 3 percent of Korea's annual LNG imports.

Shell Trading has demonstrated trust in Petralon, indicating increasing confidence among investors in indigenous operators within Nigeria’s energy sector.

由 AI 报道

A day after seismic activity halted underground production at Garpenbergsgruvan, the situation remains under control but resumption timeline is unclear. Staff continue above-ground work as inspections await safety clearance. Boliden schedules resident info meeting Wednesday.

The OPEC+ alliance is set to consider a larger-than-expected increase in oil supplies during its Sunday meeting, according to a delegate, following US and Israeli air strikes on targets inside Iran. This potential shift in production strategy comes amid military escalation threatening global energy flows. Israel’s Energy Ministry has ordered the temporary closure of several offshore natural gas fields due to security assessments.

由 AI 报道

PT Bumi Resources Minerals Tbk (BRMS) has clarified reports of the sealing of its gold mine concession area in Palu, Central Sulawesi. The company states that the sealed area has not yet been operated and does not affect ongoing production.

 

 

 

此网站使用 cookie

我们使用 cookie 进行分析以改进我们的网站。阅读我们的 隐私政策 以获取更多信息。
拒绝