Tesla hires Gary Jiang for Terafab chip project

Tesla has appointed semiconductor industry veteran Gary Jiang as director of its Terafab chip fabrication initiative in Austin.

The electric vehicle maker selected Jiang, who spent nearly 18 years at Intel in semiconductor manufacturing, for the role.

Jiang has listed his position at Tesla as “Director, Tera Fab.”

The hire marks Tesla's first major addition to the Terafab effort, which focuses on chip production in Austin.

相关文章

Illustration depicting Tesla's Optimus robot production timelines at Fremont factory in 2026 and Giga Texas in 2027, featuring Elon Musk and assembly lines.
AI 生成的图像

Tesla details Optimus production timelines at Fremont and Giga Texas

由 AI 报道 AI 生成的图像

Building on 2025 shareholder meeting announcements and ongoing Giga Texas construction, Tesla plans large-scale Optimus production at Fremont later in 2026—replacing Model S and X lines—followed by a higher-capacity Giga Texas factory in 2027. Elon Musk shared updated timelines recently.

Intel CEO Lip-Bu Tan announced that the company will work closely with Elon Musk to support the Terafab project. The initiative involves a joint chip development and fabrication effort by SpaceX and Tesla. A photo shows the executives shaking hands last weekend.

由 AI 报道

Tesla vice president of vehicle engineering Lars Moravy has teased significant updates on the company's Austin operations. The announcement is set for Tuesday, July 7.

此网站使用 cookie

我们使用 cookie 进行分析以改进我们的网站。阅读我们的 隐私政策 以获取更多信息。
拒绝