Artemis II

关注

NASA has set March 6 as the earliest possible launch date for the Artemis II mission following a successful second fueling test of its Space Launch System rocket. The test at Kennedy Space Center resolved issues from an earlier attempt marred by a hydrogen leak. The mission will send four astronauts around the Moon in a crewed test of the Orion spacecraft.

由 AI 报道

NASA has begun a critical two-day wet dress rehearsal for the Artemis II mission at Kennedy Space Center, simulating launch procedures without engine ignition. The test involves loading the Space Launch System rocket with over 700,000 gallons of propellant and could pave the way for a crewed launch as early as February 8. This marks preparation for the first human trip beyond low Earth orbit since 1972.

此网站使用 cookie

我们使用 cookie 进行分析以改进我们的网站。阅读我们的 隐私政策 以获取更多信息。
拒绝