NASA targets March 6 for Artemis II moon mission launch

NASA has set March 6 as the earliest possible launch date for the Artemis II mission following a successful second fueling test of its Space Launch System rocket. The test at Kennedy Space Center resolved issues from an earlier attempt marred by a hydrogen leak. The mission will send four astronauts around the Moon in a crewed test of the Orion spacecraft.

The Artemis II mission marks NASA's next step in returning humans to the Moon's vicinity after more than 50 years. On Thursday, technicians at Kennedy Space Center in Florida conducted a second Wet Dress Rehearsal (WDR) for the Space Launch System (SLS) rocket, loading over 700,000 gallons of liquid propellant without major leaks. This contrasted with the first attempt on February 2, when a hydrogen leak from the main fueling line exceeded safety limits of 16 percent, prompting a pause, propellant drainage, and seal replacements.

During the successful test, hydrogen sensors registered just 1.6 percent, well below limits. The countdown proceeded nearly on schedule, including two runs of the final 10-minute terminal sequence, ending at T-minus 29 seconds. Minor issues arose, such as a brief loss of ground communications—resolved via backup systems—and a potential problem with the booster avionics system, which engineers are reviewing.

"We’re now targeting March 6 as our earliest launch attempt," said Lori Glaze, acting associate administrator for NASA’s exploration programs, during a Friday press conference. She added a caveat: "There is still pending work. There’s work, a lot of forward work, that remains." The launch window opens at 8:29 pm EST on March 6 (01:29 UTC on March 7), with backups on March 7, 8, 9, and 11, or possibly April, depending on lunar positioning and other constraints.

The nine- to 10-day mission will carry commander Reid Wiseman, pilot Victor Glover, and mission specialists Christina Koch and Jeremy Hansen aboard the Orion spacecraft. The crew will orbit the Moon's far side, setting a record for the farthest human travel from Earth and testing Orion's life support systems as a precursor to future lunar landings at the south pole by 2028.

Charlie Blackwell-Thompson, NASA’s Artemis II launch director, described the test as showing "very good performance" from the hydrogen seals. John Honeycutt, chair of the Artemis II Mission Management Team, called it "a good day for us," though data analysis continues. Upcoming tasks include a Flight Readiness Review and retesting the rocket’s range safety system. The astronauts entered preflight quarantine in Houston on Friday and will head to Florida five to seven days before launch.

The Teflon seals, which caused issues during the uncrewed Artemis I in 2022, performed better than in prior operations, boosting confidence for the actual launch.

相关文章

NASA Administrator Jared Isaacman announces delay of first human moon landing to Artemis IV in 2028 during press conference.
AI 生成的图像

NASA delays moon landing to Artemis IV in 2028

由 AI 报道 AI 生成的图像

NASA has overhauled its Artemis program, postponing the first human moon landing until the Artemis IV mission in early 2028. The changes, announced by Administrator Jared Isaacman on February 27, 2026, aim to increase launch frequency and reduce risks after repeated delays with the Space Launch System rocket. An additional test flight, now Artemis III, will focus on low-Earth orbit rendezvous with commercial lunar landers.

NASA has begun a critical two-day wet dress rehearsal for the Artemis II mission at Kennedy Space Center, simulating launch procedures without engine ignition. The test involves loading the Space Launch System rocket with over 700,000 gallons of propellant and could pave the way for a crewed launch as early as February 8. This marks preparation for the first human trip beyond low Earth orbit since 1972.

由 AI 报道

NASA has delayed the Artemis II mission to April 1 following a helium flow problem that rolled the rocket back from the pad, building on prior fixes for hydrogen leaks during fueling tests. This first crewed lunar orbit since 1972 faces ongoing maintenance before returning to the launch site.

NASA启动了首次从国际空间站(ISS)的医疗撤离行动,因一名乘员出现严重但未披露的健康问题,将四名宇航员提前送回地球。该团队包括两名美国人、一名日本宇航员和一名俄罗斯宇航员,比原计划提前一个多月在太平洋海域溅落。此举优先考虑地面医疗护理,同时确保该宇航员的稳定状况。

由 AI 报道

中国成功完成梦舟飞船的关键安全测试,这是为2030年载人登月任务做准备的重要一步。该测试包括长征十号火箭的首次飞行,从海南发射。无人飞船在发射后分离,并在指定位置溅落海洋。

NASA has updated its policy to permit astronauts to take personal smartphones on missions to the International Space Station and beyond. This change aims to enable crews to capture and share personal moments more easily. The decision was announced by NASA Administrator Jared Isaacman.

由 AI 报道

One day after announcing the unprecedented step, NASA has elaborated on plans to return four astronauts from the Crew-11 mission early due to a stable medical issue affecting one crew member. The operation, the first of its kind in 25 years, is scheduled for the coming days aboard their SpaceX Dragon spacecraft.

 

 

 

此网站使用 cookie

我们使用 cookie 进行分析以改进我们的网站。阅读我们的 隐私政策 以获取更多信息。
拒绝