Ministry of Public Works starts drilling 24 boreholes in Aceh Tamiang

The Ministry of Public Works (PU) has begun constructing 24 raw water borehole points in Aceh Tamiang Regency, Aceh Province, to provide emergency clean water following the flash flood disaster. This initiative supports community health recovery after basic infrastructure like roads and bridges improves. Public Works Minister Dody Hanggodo emphasized the urgency of clean water to prevent diseases.

The Ministry of Public Works (PU) has initiated raw water drilling operations at 24 points in Aceh Tamiang Regency to address the urgent need for clean water following flash floods. The project aims to establish emergency clean water services and support community health recovery, after addressing basic infrastructure such as roads and bridges.

Public Works Minister Dody Hanggodo highlighted clean water as the top priority. "If there's no water, diseases will surely come. After roads and bridges start improving, our next focus is water. Clean water must be available immediately for all communities," he stated in a written release in Jakarta on Monday (December 29, 2025).

By Sunday (December 28, 2025), borehole construction had begun at several sites. Drilling is underway at three points: Simpang Lhee Mosque in Manyak Payed Subdistrict, Al Ikhlas Mosque in Banda Mulia Subdistrict, and the Kuala Simpang Subdistrict Office. Four other locations are in preparation: Matang Taupah Village in Bendahara Subdistrict, Manahini Gempong in Karang Batu Subdistrict, Bandar Kalifah Village in Tamiang Hulu Subdistrict, and Darul Mukhlisin Islamic Boarding School in Karang Baru Subdistrict.

Geoelectric surveys are being conducted by the Groundwater Balai (BAT) team to ensure optimal groundwater potential. At Darul Mukhlisin Boarding School, drilling equipment is on site and ready. The 24 points are spread across 12 locations, supported by five drilling units and one Koken drilling truck mobilized from Banda Aceh.

This effort is part of an integrated clean water provision program by the Directorate General of Human Settlements and the Directorate General of Water Resources under the Ministry of PU. Distribution includes four locations each in Karang Baru, Kuala Simpang, Bendahara, and Manyak Payed Subdistricts; and two each in Rantau, Sekerak, Kejuruan Muda, Seruway, Bandar Pusaka, Tenggulun, Banda Mulia, and Tamiang Hulu Subdistricts.

The Ministry of PU is also operating four mobile water treatment installation (IPA) units, 20 water tank trucks, 12 biority units, 63 public hydrants, 26 portable toilets, seven emergency toilets, 39 water towers, and three fecal vacuum trucks in Aceh. Additional resources, including eight mobile IPA units, two water tank trucks, seven public hydrants, 21 emergency toilets, four water towers, and eight mud cleaning units, are being mobilized.

Minister Hanggodo reaffirmed the Ministry's commitment to accelerating clean water and sanitation infrastructure in affected areas, particularly Aceh Tamiang.

ተያያዥ ጽሁፎች

Volunteers, cadets, and Pertamina teams collaborate to restore hospital, schools, and markets in flood-hit Aceh Tamiang, signaling recovery.
በ AI የተሰራ ምስል

Collaborative recovery of public services in Aceh Tamiang post-disaster

በAI የተዘገበ በ AI የተሰራ ምስል

Following floods and landslides in Aceh Tamiang, various parties are collaborating to restore health, education, and economic services. Pertamina supports RSUD Muda Sedia with energy and clean water supplies, while the government deploys ASN volunteers and IPDN cadets to clean public facilities. Market activities are resuming, signaling economic recovery.

One week after initiating drilling at 24 borehole sites in Aceh Tamiang to restore clean water post-flash floods, the Ministry of Public Works reports significant progress. As of January 5, 2026, eight drilling units have advanced to depths of 70 to 105 meters, tailored to local geology, with some sites now operational.

በAI የተዘገበ

Indonesia's Ministry of Public Works and Housing (PU) is accelerating connectivity restoration in Aceh after floods and landslides, prioritizing 13 broken bridges on the Central Trans route. Minister Dody Hanggodo emphasized the effort's importance for public mobility and logistics distribution. Temporary Bailey bridge installations are underway to restore access to mountainous areas like Takengon.

President Prabowo Subianto allocates APBN efficiency funds to speed up rehabilitation after landslides and flash floods in Sumatera. Efforts cover energy and telecommunications infrastructure recovery in Aceh, North Sumatera, and West Sumatera. TelkomGroup has activated 90 percent of base transceiver stations in North and West Sumatera, with primary focus now on Aceh.

በAI የተዘገበ

Floods and landslides in Aceh, North Sumatra, and West Sumatra have killed 867 people as of December 5, 2025, displacing thousands. Finance Minister Purbaya Yudhi Sadewa says additional funds are ready pending BNPB's proposal. Response efforts involve TNI, Polri, and private aid for evacuation and logistics.

Agriculture Minister Andi Amran Sulaiman released 207 trucks of logistics aid worth Rp34.8 billion for communities affected by floods in Aceh, North Sumatra, and West Sumatra. This aid is part of a total Rp75 billion reported to the President. Shipments are conducted via sea and air routes to reach isolated areas.

በAI የተዘገበ

Indonesia's Deputy Speaker Cucun Ahmad Syamsurijal inspected repairs to the Meureudu Bridge, destroyed by flooding in Pidie Jaya, Aceh, and called for prioritizing provincial road connectivity. He also delivered humanitarian aid and pushed for faster river normalization and temporary housing for flood victims.

 

 

 

ይህ ድረ-ገጽ ኩኪዎችን ይጠቀማል

የእኛን ጣቢያ ለማሻሻል ለትንታኔ ኩኪዎችን እንጠቀማለን። የእኛን የሚስጥር ፖሊሲ አንብቡ የሚስጥር ፖሊሲ ለተጨማሪ መረጃ።
ውድቅ አድርግ