Upme opens call for Nueva Lorica substation

The Mining-Energy Planning Unit (Upme) has launched a public call for the design and construction of the Nueva Lorica Substation, including its associated transmission lines. The project aims to bolster energy services in the departments of Sucre and Córdoba, addressing the rising electricity demand in the municipalities of Lorica, Chinú, and Coveñas.

The Upme, led by director Indira Portocarrero Ospina, has started the process to upgrade energy infrastructure in northern Colombia. The Nueva Lorica substation will add new transmission capacity to strengthen existing networks and minimize supply disruptions.

The entity notes that electricity demand in Lorica, Chinú, and Coveñas has grown steadily in recent years. The project will stabilize voltage for homes, businesses, and institutions, while reducing outages and failures. It will also support economic growth by enabling investments and new generation projects.

Indira Portocarrero Ospina, Upme's director, emphasized the social benefits: "families that have historically suffered from the lack of energy as a fundamental right today. Thanks to President Gustavo Petro's guidelines, we are advancing toward a future with energy justice".

The initiative aligns with the government's efforts to ensure reliable supply and advance the energy transition in the country.

Labaran da ke da alaƙa

Miners examining gold ore samples at a site in Chile's Atacama Desert with mining equipment and mountains in the background.
Hoton da AI ya samar

Miners confirm major gold findings in Atacama

An Ruwaito ta hanyar AI Hoton da AI ya samar

Two mining companies announced progress on gold projects in the Maricunga corridor in Chile's Atacama region. President José Antonio Kast also backed Kinross's Lobo Marte project.

The Ministry of Mines and Energy announced an electrical interconnection with Venezuela through Vichada. The announcement came during the socialization of the El Merey Solar Plant, which will have 5 megawatts of capacity.

An Ruwaito ta hanyar AI

The Ministry of Mines and Energy announced the reactivation of Puerto Voluntad starting July 1 to expand the country's logistical capacity.

The Ministry of Mines and Energy presented a strategy with 50 actions to strengthen the energy system ahead of the El Niño phenomenon expected in the second half of 2026.

An Ruwaito ta hanyar AI

President Claudia Sheinbaum Pardo inaugurated the Central Ciclo Combinado González Ortega of CFE in Mexicali, Baja California, and stressed that energy production is a pillar of national sovereignty.

Wannan shafin yana amfani da cookies

Muna amfani da cookies don nazari don inganta shafin mu. Karanta manufar sirri mu don ƙarin bayani.
Ƙi