Four areas in Mora proposed for solar parks

Mora municipality has identified four potential sites for solar parks on municipal land. The areas range in size from 6 to 70 hectares, with one located near Mora Siljan Airport. This comes from an investigation conducted by the municipality.

Mora municipality has designated four areas on municipal land as suitable for establishing solar parks. These sites range in size from 6 to 70 hectares, based on an investigation carried out by the municipality. One of the proposed locations is a few kilometers outside Mora, near Mora Siljan Airport, where rows of solar panels could potentially be visible from the air to travelers flying to and from the area.

The investigation aims to identify suitable areas for renewable energy production. According to reporting from moratidning.se, these four sites are now under discussion as possible locations for solar parks. The municipality emphasizes the importance of utilizing municipal land effectively for sustainable development.

No decisions have yet been made to proceed with the projects, but the proposals represent a step toward increased solar energy in the region. The article was written by Eric Salomonsson and published in Dala-Demokraten.

関連記事

Illustration depicting the proposed discontinuation of the Mora-Arlanda flight route and its impact on Dalarna's ambulance and firefighting services.
AIによって生成された画像

Trafikverket proposes closure of Mora–Arlanda flight route in 2027 amid local backlash

AIによるレポート AIによって生成された画像

Trafikverket proposes ending the subsidized Mora–Arlanda flight service from October 2027, drawing sharp criticism from local politicians, regional stakeholders, and Sweden's regional airports for threatening business, international connectivity, and emergency services like ambulance transports and firefighting. The plan, first reported in SVT Nyheter Dalarna on March 12, reverses a 2023 reinstatement due to public transport gaps.

Nils Grunditz, CEO of Green Power Sweden, urges Dalarna's municipalities to heed the government and approve wind power projects. He emphasizes wind power's role in climate transition and the government's 26 million kronor incentives for the region.

AIによるレポート

Four regional councilors from Samling för Dalarna unveiled plans on Tuesday for a 1.2 billion kronor renovation of Mora lasarett. The investment addresses 1970s operating rooms, work environment issues, and threats of fines following a prolonged process with setbacks.

In March 2026, Uppsala municipality will relocate several park, outdoor, nature, and forest management units to Kåbovägen 17 from Sågargatan 17. The move aims to consolidate expertise for improved collaboration and more efficient use of resources. It affects around 110 employees in Avdelning park och natur.

AIによるレポート

Voting in the 2025–2026 citizen budget for rural areas has concluded. Out of 43 proposals, 31 projects will be carried out with a total budget of 2.3 million kronor.

Prime Minister Abiy Ahmed (Dr.) inaugurated factories with significant capacity for the energy sector in Hawassa Industrial Park on Miyazya 17, 2018 EC (April 25, 2026). Three solar factories and a supporting gas factory were launched. Together, the solar plants will generate over 11.3 gigawatts of clean power annually.

AIによるレポート

Uppsala municipality has been awarded Sveriges Arkitekters Planpris for the planning of the Rosendal district. The prize was presented at the Arkitekturgalan in Skellefteå on March 26. The jury praised the municipality's high level of ambition from concept to completion.

 

 

 

このウェブサイトはCookieを使用します

サイトを改善するための分析にCookieを使用します。詳細については、プライバシーポリシーをお読みください。
拒否