Economic survey credits Kaleshwaram project for Telangana's land increase

The 2025-26 Economic Survey reports that the Kaleshwaram Lift Irrigation Project, launched by the previous BRS government, increased Telangana's cultivable land by 70%. This comes amid criticism from the current Congress government over irregularities in the project. The findings offer relief to the BRS amid ongoing probes.

Amid political tensions in Telangana, the 2025-26 Economic Survey highlights a significant rise in the state's cultivable land. The report states that the area grew from 1.31 crore acres in 2014 to 2.2 crore acres by 2023-24, largely due to flagship projects like the Kaleshwaram Lift Irrigation Project and Mission Kakatiya, initiated by the previous BRS government from 2014 to 2023.

The survey notes, “In Telangana, the cultivated area, which stood at 1.31 crore acres in 2014, increased to 2.2 crore acres by 2023-24 due to major flagship projects, such as the Kaleshwaram lift irrigation project and Mission Kakatiya (tank rejuvenation). Therefore, access to irrigation facilities, aligning crops with natural resource endowments and using climate-resilient high-yielding variety seeds, among other interventions, are imperative for improving yields.”

However, the National Dam Safety Authority (NDSA) identified “irreparable damage” in three barrages of the project, including severe settlement and cracking in the Medigadda barrage's piers. Similar seepage issues affect the Annaram and Sundilla barrages. The current Revanth Reddy-led Congress government requested an NDSA inspection in February 2024 and publicized the findings, citing design deficiencies, construction defects, and maintenance failures.

The P C Ghose Commission, probing alleged irregularities, held former Chief Minister K Chandrashekar Rao (KCR) responsible. The BRS dismissed the probe as politically motivated. BRS working president K T Rama Rao stated, “The Economic Survey 2025-26 has put it on record: The Telangana ‘Decade of Transformation’ under BRS rule stands out as one of India’s most successful state-led development stories.”

The survey provides a boost to the BRS, even as the Congress continues its investigations. Located on the Godavari river, Kaleshwaram spans 13 districts with an 1,800 km canal network to supply water to northern Telangana.

Makala yanayohusiana

Illustration of India's Economic Survey 2025-26 tabling in Parliament, highlighting GDP growth, reforms, manufacturing revival, and PM Modi's approval.
Picha iliyoundwa na AI

India's economic survey 2025-26 highlights growth and reforms

Imeripotiwa na AI Picha iliyoundwa na AI

India's Economic Survey 2025-26, tabled in Parliament on January 30, 2026, projects robust GDP growth amid global uncertainties and recommends key reforms for strategic resilience. It emphasizes manufacturing revival, digital curbs and policy overhauls to bolster economic stability. Prime Minister Narendra Modi praised it as a roadmap for inclusive development.

The Union Jal Shakti ministry has established a technical expert group to oversee repairs at the Srisailam dam on the Krishna River, following concerns raised by the National Dam Safety Authority about structural damage. The panel will focus on rehabilitating the damaged plunge pool and apron to ensure safety. This action comes nearly nine months after initial warnings in May 2025.

Imeripotiwa na AI

Karnataka's 2026 budget has again referenced the proposed Navali Balancing Reservoir to address silt issues in the Tungabhadra reservoir. Chief Minister Siddaramaiah highlighted consultations with neighboring states, yet no concrete steps have advanced the project. Farmers express frustration over repeated mentions without action.

Kerala, renowned for its high literacy and life expectancy, is now grappling with mounting fiscal pressures that threaten its pro-people policies. The state's economy recorded a robust 6.5% growth in 2023-24, but high committed expenditures and reduced central shares pose significant hurdles. Remittances continue to bolster growth, yet unemployment and sectoral imbalances persist.

Imeripotiwa na AI

The Telangana legislative assembly unanimously adopted a resolution opposing the central government's Viksit Bharat Guarantee for Rozgar and Aajeevika Mission (Grameen) Act-2025, which replaces the Mahatma Gandhi National Rural Employment Guarantee Act, citing threats to rural employment security and federalism principles.

As India's Maoist insurgency winds down, thousands of Adivasis displaced from Chhattisgarh face uncertainty in Telangana and Andhra Pradesh. They have settled in border forests for 15-20 years, practicing podu cultivation on vast lands, but now confront state land reclamation drives. The National Commission for Scheduled Tribes has recommended return options or rights to stay.

Imeripotiwa na AI

Telangana's Deputy Chief Minister Mallu Bhatti Vikramarka has strongly refuted allegations of irregularities in the tendering process for Naini coal blocks under Singareni Collieries Company Limited, stating the state government is ready for any inquiry. He demanded a central probe into all tenders and contracts since 2014. Vikramarka defended existing practices and emphasized the company's autonomy.

Jumamosi, 4. Mwezi wa nne 2026, 18:31:19

Basavaraj Bommai blames Congress for Upper Krishna Project delay

Jumamosi, 4. Mwezi wa nne 2026, 02:09:16

Kumaraswamy vows to stand with state government on development issues

Jumamosi, 28. Mwezi wa tatu 2026, 14:45:44

Telangana CM lays foundation for Musi temples redevelopment

Ijumaa, 27. Mwezi wa tatu 2026, 04:31:55

Uttar Pradesh eyes Sambhal as religious hub with Rs 300 crore parikrama revamp

Alhamisi, 12. Mwezi wa tatu 2026, 12:36:55

Telangana chief minister unveils Musi river rejuvenation plans

Ijumaa, 20. Mwezi wa pili 2026, 12:31:57

Karnataka minister's comments on commissions spur row

Jumapili, 8. Mwezi wa pili 2026, 08:05:17

Deputy chief minister attacks BRS ahead of Telangana municipal polls

Alhamisi, 5. Mwezi wa pili 2026, 11:21:09

Migrant workers root themselves in Telangana's farms

Jumapili, 1. Mwezi wa pili 2026, 23:52:46

Budget 2026 announces Rs 12,000-crore National Waterway 5 for Odisha

Jumanne, 27. Mwezi wa kwanza 2026, 18:00:48

Kaunti nane za Kenya zitafaidika na mabwawa sita mapya ifikapo 2026

 

 

 

Tovuti hii inatumia vidakuzi

Tunatumia vidakuzi kwa uchambuzi ili kuboresha tovuti yetu. Soma sera ya faragha yetu kwa maelezo zaidi.
Kataa