Contraflow on Japek toll extended from KM 47 to KM 70

PT Jasamarga Transjawa Tol implemented contraflow on Jakarta-Cikampek Toll Road towards Cikampek, initially from KM 55 to 70 starting at 20.43 WIB, now extended to KM 47 to 70 from 22.05 WIB due to rising vehicle volume during 2026 Lebaran homecoming. The measure follows police discretion to ease congestion.

Traffic engineering on Jakarta-Cikampek Toll Road towards Cikampek was extended by PT Jasamarga Transjawa Tol (JTT) due to rising vehicle volumes during the 2026 Lebaran homecoming or Idulfitri 1447H/2026 period. Initially, contraflow applied from KM 55 to 70 starting at 20.43 WIB. Due to continued traffic increases, it was expanded to KM 47 to 70 from 22.05 WIB under police discretion, as announced by JTT on the evening of March 17, 2026 (local time +07:00). Density was observed amid public movements ahead of the Idulfitri 1447H/2026 holiday. JTT advised road users to ensure vehicles are in prime condition, with sufficient e-money balance and fuel, and to bring provisions to avoid rest area crowds. Drivers should obey traffic signs and follow on-site officer instructions. PT JTT Vice President Corporate Secretary & Legal, Ria Marlinda Paallo, stated, “Entering the Idulfitri 1447H/2026 holiday period, traffic volume is observed to increase, so we continue to urge Trans Java toll road users to prioritize safety and prepare before entering the toll road journey. Ensure self and vehicle in prime condition, sufficient power, fuel, and e-money balance, and comply with signs and field officer directions.” Latest updates are available via the Travoy app or Jasa Marga One Call Center at 133, operating 24 hours.

Awọn iroyin ti o ni ibatan

Heavy traffic jam at Cikampek Utama toll gate towards Jakarta during 30% toll discount.
Àwòrán tí AI ṣe

Vehicle volume towards Jakarta rises at Cikampek Utama toll gate during discount

Ti AI ṣe iroyin Àwòrán tí AI ṣe

PT Jasamarga Transjawa Tol recorded higher vehicle volume at Cikampek Utama toll gate in Karawang towards Jakarta, due to a 30 percent toll discount on March 26-27, 2026.

PT Jasa Marga reports that Eid 2026 return traffic on the Trans Java Toll Road has begun to ease as of Sunday (March 29). The local Presisi one-way traffic scheme was officially closed at 10 p.m. WIB by Transport Minister Dudy Purwagandhi. Around 2.9 million vehicles have entered Jakarta.

Ti AI ṣe iroyin

Following the record Lebaran 2026 mudik peak on March 18, vehicle traffic on the Mohammed Bin Zayed (MBZ) elevated toll road fell on Friday, March 20 (eve of Idul Fitri 1447 H), with total two-way volume at 45,295 vehicles—a slight outbound dip from Jakarta and sharp inbound decline.

PT Jasa Marga recorded a record Lebaran 2026 mudik traffic peak of 270,315 vehicles on March 18, H-3 Lebaran. This marked a 98.3% increase from normal levels and 4.6% from the previous year. A total of 1.48 million vehicles left Jabodetabek from H-10 to H-3.

Ti AI ṣe iroyin

PT Jasa Marga projects the peak Lebaran 2026 return traffic on March 29 with around 250,000 vehicles heading to Jakarta. CEO Rivan A. Purwantono based the forecast on current monitoring trends. The government urges using a 30% toll discount on March 26-27 to distribute traffic.

Water pooling continues to flood the Sedyatmo toll road toward Soekarno-Hatta Airport on Tuesday, January 13, 2026, due to overflow from Kali Perancis. Traffic is congested at the Rawa Bokor off ramp KM 31+000, though officials are addressing the flooding. The impact extends to the Dalam Kota toll road, with water depths of 10-15 centimeters.

Ti AI ṣe iroyin

Lebaran 2026 return traffic from Sumatra to Java surges, recording 327,646 passengers and 89,389 vehicles by March 25. PT ASDP Indonesia Ferry ensures smooth ferry services, while the government runs a free ride program for safety.

 

 

 

Ojú-ìwé yìí nlo kuki

A nlo kuki fun itupalẹ lati mu ilọsiwaju wa. Ka ìlànà àṣírí wa fun alaye siwaju sii.
Kọ