Federal prosecutors take over investigation into Berlin power grid arson attack

In an update to the arson attack on a Berlin cable bridge claimed by the Volcano Group—which triggered the city's longest post-war power outage—the Federal Prosecutor's Office has assumed control of the probe. Suspected terrorist sabotage motives are under scrutiny as outages persist for over 25,000 households into day four.

The Saturday attack near the Lichterfelde gas plant initially blacked out 45,000 households and 2,200 companies. By Tuesday, 25,500 households and 1,200 businesses remained affected, but operator Berlin Stromnetz reports provisional cable works complete and restoration on track for Thursday, per CEO Bernhard Büllmann and Mayor Kai Wegner (CDU).

Federal prosecutors are investigating sabotage against the constitution, terrorist organization membership, arson, and public service disruption. Interior Senator Iris Spranger (SPD) confirmed the Volcano Group's authentic claim, 'Turning Off the Juice for the Rulers,' attacking fossil energy exploitation (e.g., 'In the greed for energy, the earth is exploited, sucked dry...'). The anarchist group, active in Berlin/Brandenburg since 2011, has claimed 11 criminal complexes.

Police have received dozens of tips (eight promising), secured extensive video, and dismissed online Russian involvement theories. The Interior Ministry will brief the Bundestag Interior Committee.

Aid continues with 24/7 public pools for showers, Bundeswehr emergency generators/food/transport, ~20 closed schools, and hotel reimbursements. The incident exposes grid vulnerabilities—public cable maps will be restricted, with plans for enhanced video, sensors, and AI detection. Interior Senator Spranger emphasized secrecy; expert Manuel Atug urges infrastructure redundancies instead.

相关文章

Rescue operation at the site of a collapsed historic building in Görlitz, with emergency personnel searching through rubble.
AI 生成的图像

House collapses in Görlitz as search for missing continues

由 AI 报道 AI 生成的图像

After a historic building collapsed in Görlitz, two of five missing people are safe. Police continue searching for three others.

The power outage in Sumatra on May 22, 2026, has prompted calls to strengthen the transmission network and provide compensation to customers.

由 AI 报道

Police have arrested two suspects following a house collapse in Görlitz that killed three people. The men are suspected of damaging pipes, which may have caused a gas explosion.

One year after the April 28, 2025, blackout that paralyzed power for 36 million consumers across Spain, Portugal, and parts of France, Spain's CNMC has escalated sanctions against Red Eléctrica and utilities including Endesa, Iberdrola, and Naturgy. Reinforced grid operations have spiked electricity costs, yet no structural reforms or political accountability have emerged.

由 AI 报道

A fire at the 220-KVA power station in Sector 72 led to widespread power cuts and halted Rapid Metro services in Gurugram on Friday night.

此网站使用 cookie

我们使用 cookie 进行分析以改进我们的网站。阅读我们的 隐私政策 以获取更多信息。
拒绝