Federal prosecutors take over investigation into Berlin power grid arson attack

In an update to the arson attack on a Berlin cable bridge claimed by the Volcano Group—which triggered the city's longest post-war power outage—the Federal Prosecutor's Office has assumed control of the probe. Suspected terrorist sabotage motives are under scrutiny as outages persist for over 25,000 households into day four.

The Saturday attack near the Lichterfelde gas plant initially blacked out 45,000 households and 2,200 companies. By Tuesday, 25,500 households and 1,200 businesses remained affected, but operator Berlin Stromnetz reports provisional cable works complete and restoration on track for Thursday, per CEO Bernhard Büllmann and Mayor Kai Wegner (CDU).

Federal prosecutors are investigating sabotage against the constitution, terrorist organization membership, arson, and public service disruption. Interior Senator Iris Spranger (SPD) confirmed the Volcano Group's authentic claim, 'Turning Off the Juice for the Rulers,' attacking fossil energy exploitation (e.g., 'In the greed for energy, the earth is exploited, sucked dry...'). The anarchist group, active in Berlin/Brandenburg since 2011, has claimed 11 criminal complexes.

Police have received dozens of tips (eight promising), secured extensive video, and dismissed online Russian involvement theories. The Interior Ministry will brief the Bundestag Interior Committee.

Aid continues with 24/7 public pools for showers, Bundeswehr emergency generators/food/transport, ~20 closed schools, and hotel reimbursements. The incident exposes grid vulnerabilities—public cable maps will be restricted, with plans for enhanced video, sensors, and AI detection. Interior Senator Spranger emphasized secrecy; expert Manuel Atug urges infrastructure redundancies instead.

Artículos relacionados

Rescue operation at the site of a collapsed historic building in Görlitz, with emergency personnel searching through rubble.
Imagen generada por IA

House collapses in Görlitz as search for missing continues

Reportado por IA Imagen generada por IA

After a historic building collapsed in Görlitz, two of five missing people are safe. Police continue searching for three others.

El corte de energía eléctrica en Sumatra el 22 de mayo de 2026 ha generado peticiones para fortalecer la red de transmisión y ofrecer compensaciones a los clientes.

Reportado por IA

Police have arrested two suspects following a house collapse in Görlitz that killed three people. The men are suspected of damaging pipes, which may have caused a gas explosion.

A un año del apagón total que afectó a 36 millones de consumidores en España y Portugal el 28 de abril de 2025, la CNMC ha abierto expedientes sancionadores contra Red Eléctrica y eléctricas como Endesa, Iberdrola y Naturgy. Los costes del sistema eléctrico se han disparado por la operación reforzada para evitar repeticiones. Aún no hay reformas estructurales ni responsables políticos asumidos.

Reportado por IA

Un incendio en la central eléctrica de 220 KVA del sector 72 provocó cortes de energía generalizados y detuvo los servicios del Rapid Metro en Gurugram el viernes por la noche.

Este sitio web utiliza cookies

Utilizamos cookies para análisis con el fin de mejorar nuestro sitio. Lee nuestra política de privacidad para más información.
Rechazar