Solar energy surpasses coal in Colombia's electricity generation

The Unidad de Planeación Minero Energética (UPME) reported that in 2025 solar energy generated 4,473.8 GWh, surpassing coal by 25% at 3,564.2 GWh. President Gustavo Petro highlighted a 1,650% growth under his government. UPME emphasizes the sun's relevant role in the national grid.

The Unidad de Planeación Minero Energética (UPME), under the Ministry of Mines and Energy, released data showing solar energy's rise in Colombia. In 2025, it generated 4,473.8 gigawatt hours (GWh), compared to coal's 3,564.2 GWh, 25% less for the latter. UPME describes this as a turning point, shifting solar from minimal to a key player in the national grid, stating on X: “Entre 2022 y 2025, la energía solar dejó de tener una participación mínima y se convirtió en un actor relevante del sistema eléctrico nacional”.President Gustavo Petro welcomed the report on his X account. “Hemos crecido en generación de energía solar 1.650% en este Gobierno”, he wrote, adding: “Ya superamos la generación eléctrica del carbón; hay que superar por completo la generación eléctrica con gas y líquidos del petróleo. Colombia debe basar su energía en agua, sol, viento, geotermia e iniciar el uso de energía nuclear”.UPME's figures detail the growth: August to December 2022, 255.4 GWh; 2023, 1,205.2 GWh; 2024, 3,297.2 GWh; 2025, 4,473.8 GWh.Separately, UPME noted electrical coverage gains: 539,351 new homes connected in 2024, totaling 17,966,870 households served, with a national index of 93.1% in 2025, up 0.45 percentage points from 2023.

مقالات ذات صلة

Dramatic illustration of power lines blocked at Colombia-Ecuador border due to export suspension over tariffs.
صورة مولدة بواسطة الذكاء الاصطناعي

Colombia suspends electricity exports to Ecuador over tariffs

من إعداد الذكاء الاصطناعي صورة مولدة بواسطة الذكاء الاصطناعي

Colombia's Ministry of Mines and Energy published Resolution 40064 on January 22, 2026, suspending international electricity transactions with Ecuador in response to President Daniel Noboa's 30% tariffs. The measure takes effect from 6 PM that day and prioritizes national supply. Ecuador claims it has sufficient capacity to meet its energy demand without imports.

Brazil, a reference in clean energy, will have to increase generation from fossil fuel thermal plants due to the declining share of hydroelectric plants in its electricity matrix. This stems from the growth of intermittent sources like solar and wind, which require constant backups. Studies project higher CO2 emissions by 2040, though alternatives like batteries are under discussion.

من إعداد الذكاء الاصطناعي

In January 2026, imported gas accounted for 21% of total consumption in Colombia, according to Upme data. This figure highlights the rising trend in imports due to declining local reserves, as warned by Naturgas, which forecasts 26% by year's end.

Emcali has received the environmental license from the Valle del Cauca Regional Autonomous Corporation to build the Mulaló Solar Park, the largest photovoltaic project in southwestern Colombia. This approval marks a key step in the region's energy transition, with a 69.9 MWp capacity that will benefit around 50,000 households.

من إعداد الذكاء الاصطناعي

Colombia's oil production dropped 3% in January 2026 year-on-year to 746,400 barrels per day from 769,800 the previous year, according to Campetrol. Compared to December, it fell 0.1%, or 7,000 barrels, with the sharpest declines in Casanare.

لقد حققت جنوب أستراليا أعلى نسبة في العالم لتوليد الطاقة المتجددة، مسجلة 84 في المئة من الطاقة الشمسية والرياح في الربع الأخير من عام 2025. أدى هذا التحول إلى انخفاض بنسبة 30 في المئة في أسعار الكهرباء بالجملة مقارنة بالعام السابق، مما جعلها الأدنى في أستراليا. يبرز تقدم الولاية المزايا الاقتصادية للتبني واسع النطاق للطاقة المتجددة بدعم من البطاريات.

من إعداد الذكاء الاصطناعي

Renewable power capacity in Shanxi, China's traditional coal heartland, has officially surpassed coal-fired generation, marking a historic turning point for one of the nation's most carbon-intensive economies. The central province's installed new energy capacity surged to 90.48 million kilowatts in 2025, claiming 55.1 per cent of total power-generation capacity, Xinhua reported on Monday.

 

 

 

يستخدم هذا الموقع ملفات تعريف الارتباط

نستخدم ملفات تعريف الارتباط للتحليلات لتحسين موقعنا. اقرأ سياسة الخصوصية الخاصة بنا سياسة الخصوصية لمزيد من المعلومات.
رفض