Eriksbergsvägen closed evenings for frog migration

Uppsala Municipality is closing Eriksbergsvägen between Granitvägen and Ekebyvägen from March 23 to May 8, evenings from 9pm to 1am, to let common frogs, moor frogs, smooth newts and common toads cross safely.

Each spring, frogs and amphibians migrate from hibernation sites in Eriksbergs forests and residential areas across Eriksbergsvägen to breeding ponds in Ekebydalen. To reduce roadkill, Uppsala Municipality has closed the road evenings during this period in recent years. Last year, 3,614 frogs were saved, with more succeeding annually. The closure affects the stretch between Granitvägen and Ekebyvägen. Drivers are advised to take the detour via Granitvägen, past Västertorg, Norbyvägen and Karlsrogatan. The measure aims to ensure as many animals as possible reach their destination unharmed.

Mga Kaugnay na Artikulo

Security guards patrol Uppsala Central Station tracks to prevent trespassing as crowds arrive for Walpurgis Night.
Larawang ginawa ng AI

Trafikverket deploys guards to prevent track trespassing ahead of Uppsala Walpurgis Night

Iniulat ng AI Larawang ginawa ng AI

Thousands are expected to travel to Uppsala for Walpurgis Night celebrations, prompting extra guards at the central station to prevent track trespassing. Uppsala Central had the most incidents in Sweden last year with 46 cases and 136 delay hours. Fine weather and distribution of 100,000 water bottles are also planned.

Police have issued fines to drivers who ignored the nighttime closure of Eriksbergsvägen in Uppsala, a measure put in place to let frogs, toads and newts cross safely during their spring migration.

Iniulat ng AI

Trafikverket will close Vasaloppsvägen between Oxberg and Evertsberg for nearly the entire month of May to replace damaged culverts. Traffic will be rerouted via Älvdalen. The closure forms part of the final phase in upgrading the road.

On Tuesday, spectators gathered at Viktoriaslussen in Stockholm to watch the first section of a new cycle and pedestrian bridge being towed into Söderström. The 220-metre-long bridge, built in Poland, has been divided into six sections due to transport constraints. Installation work is now starting and is expected to take six weeks.

Iniulat ng AI

Uppsala municipality will begin large-scale sand removal from city roads on Monday, March 30. The effort, lasting five to seven weeks, follows a long and snowy winter. Residents must watch for signs and move vehicles 24 hours in advance.

Uppsala municipality's naming committee decided on April 21 that the new bridge over the railway near Vimpelgatan will be called Sofielundsbron. The bridge is named after the nearby Sofielund residential area and will replace the current level crossing.

Iniulat ng AI

A traffic accident occurred around lunchtime on Sunday on Road 50 just outside Borlänge towards Ludvika. A trailer got stuck in the guardrail, leading to a full road closure for about one hour. No one was injured and police suspect no crime.

 

 

 

Gumagamit ng cookies ang website na ito

Gumagamit kami ng cookies para sa analytics upang mapabuti ang aming site. Basahin ang aming patakaran sa privacy para sa higit pang impormasyon.
Tanggihan