Eriksbergsvägen closed evenings for frog migration

Uppsala Municipality is closing Eriksbergsvägen between Granitvägen and Ekebyvägen from March 23 to May 8, evenings from 9pm to 1am, to let common frogs, moor frogs, smooth newts and common toads cross safely.

Each spring, frogs and amphibians migrate from hibernation sites in Eriksbergs forests and residential areas across Eriksbergsvägen to breeding ponds in Ekebydalen. To reduce roadkill, Uppsala Municipality has closed the road evenings during this period in recent years. Last year, 3,614 frogs were saved, with more succeeding annually. The closure affects the stretch between Granitvägen and Ekebyvägen. Drivers are advised to take the detour via Granitvägen, past Västertorg, Norbyvägen and Karlsrogatan. The measure aims to ensure as many animals as possible reach their destination unharmed.

Articles connexes

Security guards patrol Uppsala Central Station tracks to prevent trespassing as crowds arrive for Walpurgis Night.
Image générée par IA

Trafikverket deploys guards to prevent track trespassing ahead of Uppsala Walpurgis Night

Rapporté par l'IA Image générée par IA

Thousands are expected to travel to Uppsala for Walpurgis Night celebrations, prompting extra guards at the central station to prevent track trespassing. Uppsala Central had the most incidents in Sweden last year with 46 cases and 136 delay hours. Fine weather and distribution of 100,000 water bottles are also planned.

Police have issued fines to drivers who ignored the nighttime closure of Eriksbergsvägen in Uppsala, a measure put in place to let frogs, toads and newts cross safely during their spring migration.

Rapporté par l'IA

Trafikverket will close Vasaloppsvägen between Oxberg and Evertsberg for nearly the entire month of May to replace damaged culverts. Traffic will be rerouted via Älvdalen. The closure forms part of the final phase in upgrading the road.

On Tuesday, spectators gathered at Viktoriaslussen in Stockholm to watch the first section of a new cycle and pedestrian bridge being towed into Söderström. The 220-metre-long bridge, built in Poland, has been divided into six sections due to transport constraints. Installation work is now starting and is expected to take six weeks.

Rapporté par l'IA

Uppsala municipality will begin large-scale sand removal from city roads on Monday, March 30. The effort, lasting five to seven weeks, follows a long and snowy winter. Residents must watch for signs and move vehicles 24 hours in advance.

La Kenya Urban Roads Authority a annoncé une fermeture nocturne partielle d'une section de Ngong Road, près du centre commercial Junction Mall, du 18 au 31 mai afin d'achever les travaux d'asphaltage du nouveau viaduc.

Rapporté par l'IA

L'Autorité des routes urbaines du Kenya (KURA) a annoncé la fermeture pour quatre mois d'une partie de la route d'Eldoret à Nairobi à partir du 18 mai, afin de construire un nouveau pont routier au-dessus de la rivière Nairobi.

 

 

 

Ce site utilise des cookies

Nous utilisons des cookies pour l'analyse afin d'améliorer notre site. Lisez notre politique de confidentialité pour plus d'informations.
Refuser