KeNHA confirms reopening of Globe Roundabout

The Kenya National Highways Authority has restored traffic flow at Globe Roundabout along Thika Superhighway. The key route into Nairobi was closed for two weeks to repair the Nairobi River Bridge. Motorists can now resume normal travel.

The Kenya National Highways Authority announced on March 25 that traffic flow has been fully restored at Globe Roundabout along Thika Superhighway (A2), a vital route into Nairobi’s Central Business District. “The Kenya National Highways Authority (KeNHA) wishes to notify motorists and the public that traffic flow at Globe Roundabout along Thika Superhighway (A2) has been restored,” KeNHA stated in the notice. “Motorists can now resume normal travel along this section.” The roundabout had been closed since March 12 for reinstatement works on the Nairobi River Bridge, causing severe congestion on Thika Superhighway, Kipande Road, and surrounding routes. Commuters faced longer travel times, route changes by public transport operators, frustration, delays, and higher fares. Businesses in and around the city centre suffered from disrupted goods movement. KeNHA advised drivers to proceed cautiously and follow instructions from traffic police and marshals on site. The authority noted the closure was essential for long-term bridge repairs. With flow restored, conditions are expected to improve gradually, easing pressure on alternatives.

Mga Kaugnay na Artikulo

Nairobi Water technicians celebrate restored water supply to flood-hit estates after pipeline repairs.
Larawang ginawa ng AI

Nairobi Water resumes supply to six estates after pipeline repairs

Iniulat ng AI Larawang ginawa ng AI

Nairobi Water has confirmed resumption of supply to Buruburu Phases 1 and 2, Kariobangi South and North, Dandora, and parts of Mathare after repairing a flood-damaged transmission pipeline along Outering Road. Services were disrupted by recent floods affecting thousands of homes. The company stated the pipeline has been fully restored.

The Kenya National Highways Authority (KeNHA) has temporarily closed a section of the Nairobi Southern Bypass bound for Ole Sereni after a road accident this morning. The crash killed one person and seriously injured another. Motorists face heavy traffic delays and have been advised to use alternative routes.

Iniulat ng AI

The Kenya Urban Roads Authority has announced a partial nightly closure of a section of Ngong Road near Junction Mall from May 18 to May 31 to complete asphalt works on the new flyover.

A lorry was involved in a single-vehicle accident at Sachangwan on the Nakuru-Eldoret highway this afternoon, Saturday April 25, 2026, blocking both lanes. The incident has led to long queues of vehicles on both sides and delays for travellers between the Rift Valley and Western Kenya. Police have issued diversion routes as clearance operations continue.

Iniulat ng AI

The Kenya National Highways Authority (KeNHA) has warned motorists against using the Chapareria-Morpus section of the Kitale-Morpus Road due to flooding. The stretch, approximately 1km from Morpus, is cut off and unsafe for vehicles, disrupting traffic between Chapareria and Sebit towards Lodwar. Authorities urge drivers to use alternative routes.

The Kenya Railways Corporation has announced it will reopen the Gilgil-Nyahururu line next month to boost freight transport in the Rift Valley. The 78-kilometre route is set to resume operations within weeks following rehabilitation efforts that began in 2020.

Iniulat ng AI

Kenya's Motorists Association has warned that the Naivasha-Kisumu-Malaba railway extension will shift most cargo from roads to rail, weakening the highway-dependent economy.

 

 

 

Gumagamit ng cookies ang website na ito

Gumagamit kami ng cookies para sa analytics upang mapabuti ang aming site. Basahin ang aming patakaran sa privacy para sa higit pang impormasyon.
Tanggihan