Electricity supply issue in Bale Zone's Fereqa resolved

A long-standing electricity supply disruption in Fereqa, Bale Zone of Oromia Region, has been resolved. The Ethiopian Electric Power service introduced a new mobile substation to restore power to affected areas. This addresses repeated concerns from local residents.

According to the Ethiopian Electric Power service, a power supply disruption in Fereqa, Bale Zone, that persisted for over two years has now been resolved. Bale Robe Region Director Humed Husen stated that since Ethiopian Calendar 2016, eight woredas and their areas have been affected. These include Sinana, Goro, Dinsho, Agarfa, Gaseara, Goba, Dawe Kechene, and others.

The issue stemmed from the limited capacity of the 66 kV voltage transformer substation in Robe town. Residents of the zone repeatedly raised queries seeking resolution. To address this, an additional mobile substation equipped with a 25 MVA Ampere Transformer has been deployed.

Using this mobile substation, the supply problem has been fully resolved starting from Tena. Additionally, the capacity of the 66 kV transformer substation has been upgraded. This development should enable easier access to electricity services for Bale Zone residents.

Artikel Terkait

Ethiopian leaders Abiy Ahmed, Temesgen Tiruneh, Shumelis Abdisa, and Eyob Tekalgn inaugurate Busa Gonofa food complex and Geter Corridor in Wellega, Oromia.
Gambar dihasilkan oleh AI

Officials inaugurate development projects in Wellega region

Dilaporkan oleh AI Gambar dihasilkan oleh AI

Ethiopian Prime Minister Abiy Ahmed, Deputy Prime Minister Temesgen Tiruneh, Oromia President Shumelis Abdisa, and National Bank Governor Eyob Tekalgn visited development works and inaugurated projects in Wellega zones of Oromia region on the same day. Projects including the Busa Gonofa integrated food industry complex and Geter Corridor development were highlighted as key for agro-industry, job creation, and economic growth.

Ethiopia's Electric Power utility is implementing a project costing over 2.4 billion birr to electrify 21 new towns in the Afar region, specifically in Afdera and Dalol areas. The initiative supports local cement and potash industries. Funding includes support from the African Development Bank.

Dilaporkan oleh AI

Ethiopia's Electric Power has achieved 80% of its electrification development targets using domestic suppliers. This effort supports the green economy and expands local investment. Anwar Abare, head of communications, shared these details with Fana Digital.

Ethiopia's National Disaster Risk Management Commission's central command delivered 100 quintals of grain to households hit by landslides in Gamo Zone's various woredas. Zone officials contributed cash and supplies as well.

Dilaporkan oleh AI

Menteri ESDM Bahlil Lahadalia menjelaskan laporan persentase listrik di Aceh yang disampaikan ke Presiden Prabowo Subianto berdasarkan data PLN, meski ada tudingan bohong akibat ketidaksesuaian dengan kondisi lapangan. Pemulihan listrik di Aceh Tengah mulai menyala secara bertahap setelah 13 hari padam pascabencana banjir dan longsor. Kendala teknis tak terduga menyebabkan target PLN meleset.

Nairobi Water has confirmed resumption of supply to Buruburu Phases 1 and 2, Kariobangi South and North, Dandora, and parts of Mathare after repairing a flood-damaged transmission pipeline along Outering Road. Services were disrupted by recent floods affecting thousands of homes. The company stated the pipeline has been fully restored.

Dilaporkan oleh AI

Deputy Prime Minister Temesgen Tiruneh has inaugurated a modern salt and fodder production factory in Afar region's Zone 1, Assayita woreda. The facility, built on 2,540 hectares, utilizes Awash River water. It creates 1,000 jobs and supports livestock development.

 

 

 

Situs web ini menggunakan cookie

Kami menggunakan cookie untuk analisis guna meningkatkan situs kami. Baca kebijakan privasi kami untuk informasi lebih lanjut.
Tolak