Transport CS Chirchir confirms active construction on Rironi-Mau Summit Highway

Kenya's Transport Cabinet Secretary Davis Chirchir has confirmed that construction is underway on 25 kilometers of the Rironi-Mau Summit Highway. The project, launched by President William Ruto in November 2025, aims to modernize key routes connecting Nairobi to western Kenya and East African neighbors.

On January 10, 2026, Transport Cabinet Secretary Davis Chirchir confirmed that construction of the Rironi-Mau Summit Highway is progressing steadily, with a total of 25 kilometers currently under construction. The China Road and Bridge Corporation (CRBC) is handling the first 5km at Rironi and 5km at Gilgil. Meanwhile, the Shandong Construction Company has started work on 10km at Kariandusi and 5km at Mau Summit.

Chirchir stated, "Today, I inspected the ongoing construction works along the Rironi-Mau Summit Highway. These are just part of the initial works programme. I expect work to ramp up in more sites along the way in the coming days."

He added, "I expressed my satisfaction with the project's progress and commended the contractors for their commendable pace of work and swift mobilisation on site, noting the positive momentum in the delivery of this critical infrastructure project."

The Ksh170 billion project utilizes a Public-Private Partnership (PPP) model, with funding sourced locally. It comprises two sections: the Nairobi-Nakuru-Mau Summit Road spanning 175 kilometers, and the Nairobi-Maai Mahiu-Naivasha Road adding 58 kilometers, both to be upgraded into multi-lane dual carriageways.

The project is expected to be completed by 2028 and will include features such as interchanges, dedicated truck lanes, pedestrian bridges, and intelligent transportation technology. It aims to streamline traffic on this vital artery connecting Nairobi to Uganda, South Sudan, Rwanda, Burundi, and the Democratic Republic of Congo.

Chirchir said, "The dualling of the Road is very critical as it aims to reduce congestion, improve road safety, and facilitate the movement of goods and passengers between Nairobi, Nakuru, Western Kenya, and our East African neighbours, thereby promoting regional integration and boosting trade."

The initiative is optimistic about creating jobs and unlocking untapped economic potential in the western region.

関連記事

President William Ruto announces the Nairobi-Thika expressway project during Jamhuri Day celebrations, with a screen rendering of the future highway.
AIによって生成された画像

President Ruto announces Nairobi-Thika expressway for 2026

AIによるレポート AIによって生成された画像

President William Ruto announced plans to build a 60-kilometre expressway linking Nairobi to Thika town during Jamhuri Day celebrations. The project, slated to begin in 2026, seeks to ease severe traffic congestion on the current route. It will start at the Museum Hill interchange and end in Thika.

The Kenya National Highways Authority (KeNHA) has pledged to plant four trees for every single one removed during the dualisation of the Rironi-Mau Summit Highway. This commitment ensures transparency and compliance with environmental regulations. The project is one of the government's major infrastructure upgrades.

AIによるレポート

The Kenya Urban Roads Authority (Kura) has announced plans to rehabilitate the key State House Road at a cost of Ksh1.6 billion. This road links Nairobi's central business district to the presidential residence and government offices. The project forms part of a larger initiative covering 92 roads with a total budget of Ksh15.6 billion.

The Kenyan government has warned it will terminate contracts for contractors overseeing stalled road projects and reassign them to capable competitors. Transport Cabinet Secretary Davis Chirchir issued the threat while addressing residents during the Agolomuok-Otati-Kogore tarmacking. The move follows payments to clear pending bills and revive over 500 projects nationwide.

AIによるレポート

President William Ruto has continued to outline promises on economic development during Republic Day celebrations. He emphasized plans for roads, rail, and other sectors to transform Kenya into a modern nation. This forms part of a Sh 5 trillion initiative.

KeNHA has specified bid details for tarmacking the Kandwia-Kyuso and Kyuso-Tseikuru roads to Wiper leader Kalonzo Musyoka's Mwingi North home, following last week's announcement and his revelation of past refusal of targeted upgrades.

AIによるレポート

At the March 6, 2026, burial of Emurua Dikirr MP Johana Ng’eno, President William Ruto ordered construction of a 190km Rift Valley road to begin within two weeks, renamed a Nairobi housing estate after him, directed compensation for Mau Forest squatters, and allocated funds for local land and university projects.

 

 

 

このウェブサイトはCookieを使用します

サイトを改善するための分析にCookieを使用します。詳細については、プライバシーポリシーをお読みください。
拒否