Opinion questions waste burning and foreign interest accusations

An opinion piece in Folha de S.Paulo criticizes the defense of burning solid waste for energy generation, known as Waste-to-Energy (WtE), and claims of foreign conspiracy against opponents. The authors highlight high costs, risks to recycling, and the need for transparent debate. They respond to a previous article accusing NGOs of fake news funded by international entities.

The opinion piece, published on February 25, 2026, in Folha de S.Paulo, is signed by a former president and executive director of the Fundação Florestal de São Paulo and by a journalist, professor of journalistic ethics at ESPM-SP, former editorial secretary of Folha (1988-92) and columnist (2013-18), author of 'Jornalismo e Desinformação' (Senac).

The authors respond to the text 'A guerra financiada contra a geração de energia a partir do lixo', published in Folha on February 20, 2026, which defends Waste-to-Energy (WtE) as a clean and efficient solution for waste. They argue that WtE is not scientific consensus and criticize the insinuation that opposing NGOs are funded by North American and European entities, without refuting specific evidence.

One WtE advocate is a professor at Universidade Columbia (USA) and founder of the Global WtERT Council, an international NGO to promote the technology. The other is president of a Brazilian association with a mostly foreign base, partner of the same network. The authors question: 'If the logic of "foreign conspiracy" applies to one side, why not the other?'

Main objections to WtE include high implementation costs reliant on public support; the risk of diverting recyclable materials to incineration, harming the circular economy; methane burning in sanitary landfills, which reduces emissions and generates energy at lower costs; and the potential to sustain a model focused solely on waste reduction, overlooking excessive consumption.

In São Paulo, about 20 thousand tons of waste are generated daily, at an annual cost exceeding R$ 2 billion. Internationally, in countries like Portugal, WtE gains traction due to landfill saturation but is criticized for not addressing roots like production, consumption, and disposal, competing with recycling. The term 'greenwashing' describes promoting WtE as a 'clean' solution. The European Parliament's site prioritizes consumption reduction, reuse, and recycling, without hailing incineration as a panacea.

The authors conclude that a 'public reckoning' should include figures on costs, climate impacts, effects on waste pickers and cooperatives, waste reduction goals, and transparency from all sides — NGOs, companies, and governments. Accusations without arguments, they say, 'do not clean or light up cities nor heat homes'. The text notes that signed articles do not reflect the newspaper's opinion but aim to stimulate debate.

Makala yanayohusiana

Indonesian officials overseeing waste site cleanup with May 2028 target banner
Picha iliyoundwa na AI

Government sets may 2028 target to resolve national waste crisis

Imeripotiwa na AI Picha iliyoundwa na AI

Coordinating Minister for Food Zulkifli Hasan has set a May 2028 deadline to end open dumping of waste nationwide. The target was announced amid President Prabowo Subianto’s direct attention to a waste crisis that has persisted for decades.

The dean of the Faculty of Environmental Science and Technology at Unika Soegijapranata has warned that waste-to-energy plants risk creating new pollution and could delay Indonesia's net zero emissions target by 2060.

Imeripotiwa na AI

Waste4Change CEO Mohammad Bijaksana Junerosano called for a total overhaul of Indonesia's waste management system amid a national garbage crisis. He highlighted a circular economy potential of Rp 500 trillion per year, provided strong infrastructure and ecosystems are in place. The remarks came at an Earth Day media gathering in Jakarta on April 20, 2026.

President Luiz Inácio Lula da Silva opened the Hannover Messe in Germany on Sunday, criticizing the European Union for insisting on 'false narratives' about Brazilian agribusiness. He defended the sustainability of the country's biofuels amid trade barriers. Brazil is the honored country at the fair for the second time.

Imeripotiwa na AI

Trade groups Andeg and Fenalcarbón stressed the need for long-term contracts and coal-fired thermal plants as backup for Colombia's power grid, with El Niño likely in the second half of 2026. Alejandro Castañeda, Andeg president, and Carlos Cante, from Fenalcarbón, warned of growing energy deficits and climate vulnerabilities.

Ijumaa, 1. Mwezi wa tano 2026, 10:00:57

Colombia hosts summit on fossil fuel transition

Alhamisi, 30. Mwezi wa nne 2026, 10:47:51

Lula confirms ethanol blend in gasoline rising to 32%

Jumatano, 15. Mwezi wa nne 2026, 06:47:45

Garbage crisis becomes permanent in Matanzas due to fuel shortage

Jumatatu, 23. Mwezi wa tatu 2026, 22:13:30

TSJM annuls Madrid's 2025 garbage tax over procedural defects

Jumamosi, 21. Mwezi wa tatu 2026, 00:07:33

Government to contribute at least 670 million to avert electricity system deficit

Alhamisi, 19. Mwezi wa tatu 2026, 09:52:30

Petro says decade's oil exploration contracts found little oil

Ijumaa, 13. Mwezi wa tatu 2026, 03:57:58

PT proposes external commission to oversee fuel prices

Jumatano, 11. Mwezi wa tatu 2026, 09:30:11

Havana residents burn garbage amid ongoing crisis

Jumanne, 3. Mwezi wa tatu 2026, 01:38:04

Economist questions increase in import taxes

Jumanne, 24. Mwezi wa pili 2026, 02:05:12

Toxic smoke invades Havana from burning garbage

Tovuti hii inatumia vidakuzi

Tunatumia vidakuzi kwa uchambuzi ili kuboresha tovuti yetu. Soma sera ya faragha yetu kwa maelezo zaidi.
Kataa