Isar Aerospace aborts second Spectrum rocket test flight

Isar Aerospace aborted the second test flight of its German Spectrum carrier rocket on Wednesday evening shortly before launch from Andøya spaceport in Norway. The countdown stopped unexpectedly just seconds before the planned engine ignition. The exact reasons remain initially unclear.

The „Onward and Upward“ mission was set to be the first launch of the Spectrum rocket carrying several small satellites. The attempt took place on March 25, 2026, around 9:21 p.m. local time but was halted about 20 minutes after the countdown ended. A live broadcast showed a boat detected in the safety zone around the coastal launch site, possibly contributing to the abort. Isar Aerospace chief engineer Nikolaos Perakis stated in the livestream that all rocket systems were in the green and the cause was now being investigated. The abort decision likely came from the computer, as CEO Daniel Metzler had told Handelsblatt: „With the launch in the last seconds of the countdown, the rocket takes full control of the launchpad.“ Ahead of the launch, Metzler said: „We want to show significant progress.“ The start had been delayed multiple times previously due to unfavorable weather. Isar Aerospace, based in Ottobrunn near Munich and founded in 2018, has raised over 500 million euros. The two-stage, 28-meter-high Spectrum rocket with ten engines is designed to deliver payloads of up to 1000 kilograms to low Earth orbits. During the first test in March 2025, the rocket lifted off from Andøya but crashed into the sea after 30 seconds. That was the first orbital rocket launch in continental Europe outside Russia. VC investor Nico Rosberg commented: „Even at SpaceX, launch aborts were part of the path to space. The rocket is ready, the technology is there, the next attempt is coming.“ Former ESA head Jan Wörner emphasized the importance of European sovereignty in spaceflight.

相关文章

Illustration depicting the dramatic liftoff of Space One's Kairos No. 3 rocket from Space Port Kii before its mission abort.
AI 生成的图像

日本初创公司Kairos No. 3火箭升空后中止飞行

由 AI 报道 AI 生成的图像

日本私人航天公司Space One于3月5日在和歌山县Kii航天港发射Kairos No. 3火箭,但几分钟后中止了飞行。这标志着该公司第三次受挫,该公司旨在成为首个将卫星送入轨道的日本私人实体。

韩国初创企业 Innospace 的 Hanbit-Nano 火箭在其首次商业轨道任务中,从巴西阿尔坎塔拉航天中心升空,但因立即出现异常约 30 秒后坠毁。该火箭携带了五颗用于 300 公里低地球轨道的卫星。事故发生在安全区,无人员伤亡。

由 AI 报道

总部位于东京的太空初创企业 Space One 在 3 月 4 日从和歌山县串本町 Kii 航天港发射 Kairos No. 3 小型火箭前不久取消发射,此前安全系统已激活。发射原定于上午 11 点,但倒计时 30 秒时中止。公司计划当天下午举行新闻发布会解释此事。

Isro is set to launch 16 satellites via the pslv-c62 mission on January 12, 2026. The primary payload is drdo's 400-kg hyperspectral earth observation satellite eos-n1 (codename anvesha), developed for strategic surveillance. The mission includes innovations like India's first orbital ai laboratory and a $2 per minute space cybercafe.

由 AI 报道

继12月17日发射中止后,日本JAXA于2025年12月22日从种子岛宇宙中心发射了第八枚H3火箭,但二级发动机过早关机后暂停了直播。该火箭搭载内阁府的引路5号卫星,用于日本准天顶卫星系统(QZSS)。

NASA has canceled the Exploration Upper Stage for its Space Launch System rocket as part of a major revision to the Artemis program. The decision, announced by Administrator Jared Isaacman, aims to accelerate lunar landings by focusing on surface activities and using more efficient upper stages. This move supports testing of human landers from SpaceX and Blue Origin ahead of missions in 2027 and 2028.

由 AI 报道

Blue Origin has announced that its next New Glenn rocket launch will reuse a booster from a recent mission, marking a rapid turnaround in orbital rocket reuse. The NG-3 mission, set for no earlier than late February, will deploy a communications satellite for AST SpaceMobile from Cape Canaveral. This follows the successful NG-2 flight in November and highlights the company's progress toward faster launch cadences.

 

 

 

此网站使用 cookie

我们使用 cookie 进行分析以改进我们的网站。阅读我们的 隐私政策 以获取更多信息。
拒绝