Power outage halts major JR lines in Tokyo

A power outage struck multiple JR East lines in Tokyo on Friday morning, January 16, suspending services on the Yamanote and Keihin-Tohoku lines. JR East anticipates resumption around 1 p.m. A fire at Tamachi Station may be linked to the incident.

On the morning of January 16, a power outage affected major JR East lines in Tokyo, suspending the inner and outer loops of the Yamanote Line, the entire Keihin-Tohoku Line, and the section between Tokyo and Shinagawa stations on the Tokaido Line. As of 9:50 a.m., services remained halted, with JR East expecting resumption by 1 p.m.

The outage was discovered around 3:50 a.m. between Shimbashi and Shinagawa stations during preparations for the first trains. Media reports indicate a fire broke out at Tamachi Station around 8 a.m., where firefighters found a burned transformer. Authorities are investigating whether the fire is connected to the outage.

The Tokaido Line resumed after a brief suspension. Delays rippled through other JR lines, prompting restrictions on platform entry at major stations to manage crowds shifting to alternative routes. No injuries have been reported.

Such disruptions underscore the vulnerability of Tokyo's rail network to power issues. JR East has not disclosed the exact cause but is probing the incident, with further details expected soon.

Verwandte Artikel

Firefighters battle blaze on cable bridge over Teltow Canal in Berlin, causing widespread power outage in southwest neighborhoods.
Bild generiert von KI

Großer Stromausfall im Berliner Südwesten durch mutmaßlichen Brandanschlag

Von KI berichtet Bild generiert von KI

Seit dem frühen Samstagmorgen sind etwa 45.000 Haushalte und 2.200 Betriebe im Berliner Südwesten ohne Strom, verursacht durch ein Feuer an einer Kabelbrücke über den Teltowkanal. Die Polizei ermittelt wegen Brandstiftung, und ein Bekennerschreiben wird geprüft. Die Versorgung könnte bis Donnerstag, den 8. Januar 2026, dauern.

A power outage near Ueno Station in Tokyo around 7 a.m. on January 30 led to a partial suspension of JR Joban Line services. East Japan Railway (JR East) attributed the issue to a broken overhead wire, with operations not expected to resume until at least 2 p.m.

Von KI berichtet

An accident occurred at Tsujido Station on the JR Tokaido Main Line around 7:35 p.m. on January 27, leading to the suspension of services between Tokyo and Atami, as well as between Shinjuku and Odawara. East Japan Railway Co. reported that services on both lines resumed around 8:37 p.m.

Tokyo Electric Power Company restarted reactor No. 6 at the Kashiwazaki-Kariwa nuclear plant after about 14 years, but suspended operations just six hours after achieving a critical state due to an alarm. This event, the company's first restart since the 2011 Fukushima disaster, highlights ongoing safety concerns in Japan's nuclear revival.

Von KI berichtet

Tokyo Electric Power Company (Tepco) announced that an alert system failed to activate during a test operation for restarting the No. 6 reactor at its Kashiwazaki-Kariwa nuclear plant. The issue was detected on Friday, raising concerns about the planned restart on Tuesday.

Central Japan Railway Co. (JR Tokai), operator of the Tokaido Shinkansen bullet trains, will introduce private compartment seats starting October 1. The plan was revealed by President Shunsuke Niwa in a recent interview with The Yomiuri Shimbun. These compartments aim to offer a premium space with secured privacy and services surpassing those in the Green Car.

Von KI berichtet

Ein massiver Stromausfall traf Mayotte am 23. Dezember und betraf das gesamte Übersee-Departement. Der Vorfall, der am frühen Nachmittag eintrat, störte die Kommunikation und die Wasserversorgung. Die Präfektur berichtet, dass 92 % der Abonnenten bis zum Abend wieder angeschlossen waren.

 

 

 

Diese Website verwendet Cookies

Wir verwenden Cookies für Analysen, um unsere Website zu verbessern. Lesen Sie unsere Datenschutzrichtlinie für weitere Informationen.
Ablehnen