NASA seeks to accelerate lunar landers for 2028 Artemis landing

NASA is working with SpaceX and Blue Origin to simplify requirements for their Human Landing Systems, aiming for a 2028 moon landing. Lori Glaze, head of NASA's deep space exploration, said both companies have submitted proposals to speed up development by avoiding complex orbits. Officials are analyzing compatibility with the Orion spacecraft.

NASA's Artemis II mission is progressing smoothly, with the Orion capsule set for reentry through Earth's atmosphere on Friday. The agency has contracted SpaceX's Starship and Blue Origin's Blue Moon as Human Landing Systems, or HLS, for lunar missions. Last year, both companies proposed accelerating timelines by skipping the near-rectilinear halo orbit, or NRHO, requirement around the planned Lunar Gateway. NASA has since removed that stipulation to reduce fuel demands, known as delta-V, for reaching and returning from the lunar surface. Glaze noted in an interview that lower orbits benefit the landers but increase demands on Orion, requiring careful balancing of power and thermal interactions. She added, “We’ve got their proposals. They’ve each brought in some good proposals. They’ve taken this very seriously.” Proposed changes include docking in low-Earth orbit by 2027 and simplifying surface operations, such as communication systems and limits on crew distance from the lander to cut mass. Glaze expressed confidence, stating, “I think we really have seen real commitment to try and do that... from both Blue and from SpaceX.” Key milestones this year include SpaceX's in-flight propellant transfer demonstration, delayed but still planned for later, and Blue Origin's Blue Moon Mk. 1 launch to test propulsion, guidance, navigation, and landing in lunar conditions. An uncrewed lunar demo would follow Artemis III. NASA is also evaluating whether to use its last Interim Cryogenic Propulsion Stage on Artemis III or save it for Artemis IV.

관련 기사

NASA Administrator Jared Isaacman announces delay of first human moon landing to Artemis IV in 2028 during press conference.
AI에 의해 생성된 이미지

NASA delays moon landing to Artemis IV in 2028

AI에 의해 보고됨 AI에 의해 생성된 이미지

NASA has overhauled its Artemis program, postponing the first human moon landing until the Artemis IV mission in early 2028. The changes, announced by Administrator Jared Isaacman on February 27, 2026, aim to increase launch frequency and reduce risks after repeated delays with the Space Launch System rocket. An additional test flight, now Artemis III, will focus on low-Earth orbit rendezvous with commercial lunar landers.

NASA has announced major changes to its Artemis program, shifting away from a lunar landing for the next mission in favor of incremental testing steps. The adjustments aim to increase launch frequency and reduce risks following recent setbacks. Officials hope this will lead to moon landings by 2028.

AI에 의해 보고됨

NASA has canceled the Exploration Upper Stage for its Space Launch System rocket as part of a major revision to the Artemis program. The decision, announced by Administrator Jared Isaacman, aims to accelerate lunar landings by focusing on surface activities and using more efficient upper stages. This move supports testing of human landers from SpaceX and Blue Origin ahead of missions in 2027 and 2028.

NASA's Space Launch System (SLS) rocket is set to launch Artemis II as soon as April 1, 2026, sending four astronauts on a crewed flyby to the Moon's far side—the farthest from Earth any humans have traveled. This follows February's Artemis program adjustments addressing SLS delays, using the rocket's powerful core stage and boosters detailed ahead of liftoff.

AI에 의해 보고됨

미국 아르테미스 2호 유인 우주선이 아폴로 계획 이후 최초로 10일간의 역사적인 달 궤도 비행을 수행함에 따라, 중국은 2030년 자국 우주비행사 달 착륙을 지원하기 위해 이번 임무의 기술적 세부 사항을 면밀히 분석하고 있다.

Nasa's Artemis 2 Orion capsule launched successfully from Kennedy Space Center with four astronauts heading to the Moon on a 400,000-kilometer journey. The rocket reached supersonic speed and is now traveling at 27,000 km/h. The automated launch control system has taken over.

AI에 의해 보고됨

The US space agency NASA is set to launch its Artemis II mission today, sending astronauts to orbit the moon for the first time in over 50 years. Four astronauts from the US and Canada will undertake a test flight lasting about ten days. Germany provides the key European Service Module for the Orion spacecraft via the European Space Agency.

 

 

 

이 웹사이트는 쿠키를 사용합니다

사이트를 개선하기 위해 분석을 위한 쿠키를 사용합니다. 자세한 내용은 개인정보 보호 정책을 읽으세요.
거부