Auction adds 4,069 MW to Colombia power system from December 2026

The firm energy obligations auction held on May 22, 2026, assigned 4,069.7 MW of new capacity to Colombia's national grid starting in December 2026.

XM, the electricity market operator, announced the results on May 23. Eighty-five plants participated and 77 received assignments, including 15 new plants and one existing plant with works.

The capacity comes mainly from thermal plants with 2,276.8 MW, followed by solar with 1,546.9 MW and wind with 246 MW. Leading regions are Magdalena with 2,336 MW, Santander with 521.8 MW, and Guajira and Cesar with 426 MW.

Closing prices were US$16.4/MWh for plants with higher variable costs and US$22/MWh for lower ones, per Creg resolution 101 066 of 2024. The auction was called by Creg through Resolution 101 079 of 2025.

Makala yanayohusiana

Colombian Energy Minister Edwin Palma announces Air-e financial crisis measures and El Niño preparations at a press conference.
Picha iliyoundwa na AI

Energy Minister Palma advances Air-e crisis measures amid El Niño threat

Imeripotiwa na AI Picha iliyoundwa na AI

Colombia’s Mines and Energy Minister Edwin Palma defended his handling of the Air-e financial crisis—ongoing since early 2026 with $1.6 trillion in debts—and announced key steps: a targeted $8/kWh surcharge on high-income users, a Creg proposal for more energy contracting ahead of El Niño, and calls for structural reforms in the Caribbean region's electricity sector.

The Ministry of Mines and Energy launched the long-term clean energy contracting auction 2026 in coordination with the Bolsa Mercantil de Colombia.

Imeripotiwa na AI

Colombia's electricity demand rose 6.07% in April 2026 compared to the same month last year, reaching 7,217.2 gigawatt-hours, according to data from XM.

President Gustavo Petro announced the liquidation of energy company Air-e to integrate its assets into a new public regional company. The measure aims to guarantee continuity of electricity service for 1.3 million users in Atlántico, Magdalena and La Guajira.

Imeripotiwa na AI

Colgas and Ladrillera Santafé launched operations of a solar park in Soacha, Cundinamarca, with a $16 billion peso investment. The project generates 5.4 MWp and aims to cut the brick factory's energy costs by up to 30%, avoiding at least 1,400 tons of CO2 emissions annually.

The Electrificadora de Santander, ESSA, reported operational revenues of 2.25 trillion pesos and an investment of 300 billion pesos in electrical infrastructure during its 135th anniversary.

Imeripotiwa na AI

Fiesp and CNI requested to join as amicus curiae in a TCU case over the energy auction that contracted R$ 515 billion. The entities oppose the bidding due to rising costs, low discounts and prioritization of polluting sources.

Jumatatu, 29. Mwezi wa sita 2026, 16:42:44

Power outages hit several regions of Colombia over the weekend

Alhamisi, 28. Mwezi wa tano 2026, 10:54:54

Colombia may need double its energy by 2030

Jumanne, 19. Mwezi wa tano 2026, 17:24:34

Tcu technicians seek partial suspension of energy auction

Jumapili, 17. Mwezi wa tano 2026, 00:52:23

Minister warns of energy supply risks from El Niño

Jumanne, 12. Mwezi wa tano 2026, 19:02:40

Colombia activates roadmap with 50 actions for El Niño

Jumanne, 5. Mwezi wa tano 2026, 15:37:15

Colombia's Ministry of Hacienda auctions 900 billion pesos in TCO at 13.450%

Jumatano, 22. Mwezi wa nne 2026, 03:10:26

Government launches long-term energy auction to secure electrical system

Jumatano, 15. Mwezi wa nne 2026, 20:26:18

Frontera Energy and Ecopetrol confirm gas regasification by end of 2026

Jumatano, 15. Mwezi wa nne 2026, 07:42:02

Colombia prepares for sharp rise in LNG imports ahead of El Niño

Ijumaa, 10. Mwezi wa nne 2026, 00:10:04

Andeg and Fenalcarbón highlight thermal plants' role ahead of possible El Niño

Tovuti hii inatumia vidakuzi

Tunatumia vidakuzi kwa uchambuzi ili kuboresha tovuti yetu. Soma sera ya faragha yetu kwa maelezo zaidi.
Kataa