Ruto announces new link road to Nakuru-Malaba highway

President William Ruto announced plans on Sunday to build a new road linking Malaba to the proposed Nakuru-Malaba highway. The move aims to improve connectivity to western Kenya without waiting for the full extension of the Rironi-Mau Summit Expressway.

President William Ruto made the announcement during a church service in Busia County. He said the government would start construction on the Malaba link road immediately rather than delay until the Rironi-Mau Summit highway reaches Mau Summit.

The proposed route runs from Malaba through Kimaeti, Kimilili and Bungoma before joining the planned Nakuru-Malaba corridor. Ruto stated, "We are building the Rironi-Mau Summit highway, which will eventually reach Malaba. However, I have said that as we wait for that one to reach Mau Summit, we start another one from Malaba as it climbs and connects with that one."

The Rironi-Mau Summit Expressway remains on schedule for completion by June 2027. The 233-kilometre project will feature a four-lane dual carriageway from Rironi to Naivasha and a six-lane section from Naivasha to Nakuru.

Makala yanayohusiana

President William Ruto confirmed plans to expand Matulo Airstrip in Bungoma and build a 300-kilometre highway from Mau Summit to Malaba.

Imeripotiwa na AI

Rais William Ruto ametangaza kuwa mradi wa Barabara ya Mau Mau unaounganisha kaunti nne umefika asilimia 60 na utakamilika ndani ya miaka miwili. Alitoa taarifa hiyo wakati wa hafla ya kanisani AIC Githumu, Kandara, Murang’a County. Serikali imetenga Ksh2 bilioni kwa sehemu ya barabara hiyo.

Mamlaka ya Barabara za Kitaifa nchini Kenya (KeNHA) imetoa taarifa kuhusu maendeleo ya ujenzi wa barabara ya kilomita 740 inayounganisha Isiolo na Mandera, ikitaja tarehe ya kukamilika Januari 2028.

Imeripotiwa na AI

Interior Principal Secretary Raymond Omollo has announced that the Ngong Road-Naivasha Road flyover is complete. The project, built by KURA, cost Ksh3.58 billion and is set to ease traffic in Nairobi.

Jumapili, 12. Mwezi wa saba 2026, 19:46:35

Ruto pledges Ksh600 million to finish Enziu Bridge by September

Jumamosi, 11. Mwezi wa saba 2026, 06:54:34

Ruto says stalled Meru road to be completed in one month

Jumatatu, 29. Mwezi wa sita 2026, 06:20:49

Ruto confirms Kenyatta Avenue-Upper Hill Viaduct completion by December

Alhamisi, 11. Mwezi wa sita 2026, 23:58:09

Ruto announces new airport construction to start in July

Ijumaa, 5. Mwezi wa sita 2026, 23:47:26

Chirchir atangaza kuanza ujenzi wa barabara ya Nakuru-Bomet-Migori Januari

Jumatano, 3. Mwezi wa sita 2026, 02:27:47

Kenha urges residents to vacate ahead of ruiru-githunguri road project

Jumapili, 31. Mwezi wa tano 2026, 17:59:48

Ruto announces revival of Modogashe-Samatar road project

Ijumaa, 15. Mwezi wa tano 2026, 09:09:11

Ruto announces april 2027 completion for rironi-mau summit road

Tovuti hii inatumia vidakuzi

Tunatumia vidakuzi kwa uchambuzi ili kuboresha tovuti yetu. Soma sera ya faragha yetu kwa maelezo zaidi.
Kataa